My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
2300 - Underground Storage Tank Program
>
PR0231948
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2026 8:10:16 PM
Creation date
8/26/2025 4:08:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0231948
PE
2361 - UST FACILITY
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SPEEDWAY) #68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
2448 W KETTLEMAN LN LODI 95240
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tanknology <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility Information Technician Information <br /> Site#:TESORO/SPEEDWAY#68153 43171/4612 Date:5/22/2025 <br /> Address:2448 WEST KETTLEMAN LANE Name:Steve Willems 1 <br /> City/State: LODI CA 0 hQ,,- <br /> Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines, and <br /> dispensers)are de-energized, and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> SITE DATA <br /> 1 Number of E-Stop switches INSIDE of the building: <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS <br /> 5 Do all E-Stops shutdown power to ALL STP's t f C <br /> 6 Are ALL E-Stops clearly Labeled t f <br /> 7 Are the TURBINE BREAKERS clearly identified/labeled (+ t <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. t f C <br /> 9 All safety barricades and test equipment has been properly removed ( f <br /> 10 E-Stop was reset and all dispensing functions are normal r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(Clearly describe any deficiencies found) <br /> WO:2379677 <br />
The URL can be used to link to this page
Your browser does not support the video tag.