Laserfiche WebLink
CGRS Contact: <br />May 9, 2024 Customer Name: <br />Arco <br />9036 Thornton Rd <br />Thornton, CA 95209 <br />San Joaquin <br />Item No.Quantity Unit Price Extended <br />1 1 flat rate 2,245.00$ 2,245.00$ <br />2 1 bottles 818.88$ 818.88$ <br />3 1 flat rate 875.00$ 875.00$ <br />4 0 days 225.00$ TBD <br />5 0 hours 165.00$ TBD <br />6 0 hours 137.50$ TBD <br />Subtotal 3,938.88$ <br />Item No.Quantity Unit Price Extended <br />1 1 day 600.00$ 600.00$ <br />Subtotal 600.00$ <br />Item No.Quantity Unit Price Extended <br />1 1 flat rate 6,823.88$ 6,823.88$ <br />2 1 flat rate 300.00$ 300.00$ <br />3 1 flat rate 875.00$ 875.00$ <br />4 0 days 225.00$ TBD <br />5 0 hours 165.00$ TBD <br />6 0 hours 137.50$ TBD <br />Subtotal 7,998.88$ <br />Telephone/Email:818-746-6986/robertv@asengineer.com <br />Robert Velasco <br />Facility:Address:28405 Sand Canyon Rd #B <br />Address: <br />Scope of Work <br />City, State, Zip:Canyon Country, CA 91387 <br />County: <br />Tahtia Pearce 916-616-2233 <br />tpearce@cgrs.com <br />Date:A & S Engineering <br />City, State, Zip:Contact: <br />Test Primary System <br />Description <br />Helium Pre-Testing (Accept O / Decline O ) __________ Initials <br />Description <br />Helium <br />Mobilization & Perdiem <br />Additional beyond 1 day Per diem <br />Additional testing hours beyond 8 hour day <br />Test Secondary Pipe (during Pre-Testing ONLY) <br />On-site standby time <br />Additional testing hours beyond 8 hour day <br />On-site standby time <br />Proposal & Cost Estimate <br />Printed Name Title <br />Project Permitting & Admin Fee <br />Mobilization & Perdiem <br />Accepted by Date <br />Additional beyond 1 day Hotel/Per diem <br />Description <br />Primary System Testing (Final ELD) <br />Optional Pre-Testing on Secondary Pipe (Accept O / Decline O ) __________ Initials <br />Final Enhanced Leak Detection (ELD) Testing (Accept O / Decline O ) __________ Initials <br />Perform pre and final ELD testing services at the above referenced location. Material costs are not included for iota test setups, however they will be <br />installed by the fuel system installation contractor prior to CGRS arrival for pretesting. In addition, this estimate is based on our understanding of the fueling <br />system, which is as follows: <br />1. Tanks -(1) 25k and (1) 12k/10k split double wall UST's -Brine filled <br />2. Sumps -(6) containing upper tank fittings and components <br />3. Under Dispenser Containment (UDC) -(6) <br />4. Vent and other Transition Sumps -(1) <br />5. Piping -(3) Product line(s) (DW FRP), (3) vent line(s) (DW FRP) and (1) vapor rec line (DW FRP) <br />Costs for all testing work is based on our current fee schedule. Costs for the final ELD/iotaVision testing assume that all site work can be completed <br />within 8 hours on site. If the work takes longer than the specified time due to no fault of CGRS, additional hourly fees will be incurred on a time and <br />materials basis in accordance with our current fee schedule. <br />The Standard Terms and Conditions attached are incorporated by reference and form part of this Agreement. By signing this Ag reement, you accept <br />the proposal and acknowledge that you have read, understand and agree to the Standard Terms and Conditions set forth in this Agreement.