Laserfiche WebLink
ER09/15/2023TANK AND PIPING MATERIALS LIST(1 OF 2)M.5.3.01ARCObpBP WEST COAST PRODUCTS, LLCPLANS PREPARED BY:A & S ENGINEERING INC.PLANNING ENGINEERING CONSTRUCTION MANAGEMENT28405 SAND CANYON ROAD, SUITE BCANYON COUNTRY, CA 91387PHONE #: (661) 250-9300; FAX #: (661) 250-9333ADDRESS9036 THORNTON ROADSTOCKTON, CA 95209____VERSION 15.0 2023 SERIESITEMBYEQUIPMENT SOLUTION FOR DIESEL DISPENSING (ALL AREAS)MANUFACTURERSTAGE I EQUIPMENT - (STANDARD OPW SOLUTION)DESCRIPTIONBYITEMMANUFACTURERSTAGE II SOLUTIONS (CHOOSE PER AREA)MANUFACTUREREQUIPMENT SOLUTION FOR PRE 3/31/01 CARB "WAYNEVAC" AREAS (TYPICAL BP)BYITEMITEMBYEQUIPMENT SOLUTION FOR CARB & MO LISTED ORVR "BALANCE" AREASMANUFACTURERMANUFACTURERBYITEMITEMBYEQUIPMENT SOLUTION FOR NON STAGE II AREASMANUFACTURERDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONDESCRIPTIONBYITEMSTAGE I EQUIPMENT - (ALL AREAS)MANUFACTURERMANUFACTURERDESCRIPTION (CALIFORNIA ARCO BRANDED CONFIGURATIONS)BYITEMMANUFACTURERDESCRIPTION ITEMBYTANKSITEM BY DESCRIPTIONSTAGE I - (FRANKLIN FUELING SYSTEMS)MANUFACTURERMANUFACTURERDISPENSERSITEM BY DESCRIPTION (BLENDERS)EQUIPMENT SOLUTION FOR EVR PHASE II LISTED AREAS CALIFORNIA (PER VR-204)