My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
9036
>
2300 - Underground Storage Tank Program
>
PR2500477
>
INSTALL_2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2025 4:34:02 PM
Creation date
8/28/2025 4:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2024
RECORD_ID
PR2500477
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0004289
FACILITY_NAME
ARCO 07193
STREET_NUMBER
9036
STREET_NAME
THORNTON
STREET_TYPE
RD
City
Stockton
Zip
95209
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
9036 THORNTON RD Stockton 95209
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If you have received this message in error, please (1) do not open any attachments, (2) reply to the sender that you have <br />received this message in error, and (3) delete this message. <br />From: Tahtia Pearce <br />Sent: Wednesday, March 26, 2025 3:26 PM <br />To: WB-DWQ-OTTL <OTTL.OTTL@waterboards.ca.gov> <br />Cc: ust@sjgov.org; Mark Z Farmer <Mark@tccontractors.com>; latham <Latham@tccontractors.com>; Ariel <br />Barrantes <ariel@tccontractors.com>; Chris Murphy <CMurphy@cgrs.com>; Richard Thomas <br /><RThomas@cgrs.com> <br />Subject: Test Notify for 9036 Thornton Rd - Stockton: Monday, 03/31/2025 @ 8am <br />Good afternoon all, <br />Please find attached notification and general contractors' statement for final ELD testing at the <br />subject site. If you have any questions or concerns, please feel free to reach out via email, <br />phone, or text. <br />The general contractor acknowledges that: <br />;equirements, <br />No further ground penetrating work is to be performed, including beautification <br />atop or immediately adjacent to the UST system after final ELD testing. <br />• ALL tank top trim needs to be completed. <br />• ALL secondaries must be reachable and accessible. <br />• ALL tanks be empty of ballast (water) and must be mopped and dry. <br />If you have any questions or concerns, please feel free to reach out to us. <br />Thank you. <br />Tahtia Pearce <br />ELD Project Coordinator CGRS <br />Mobile 916.616.2233 1 916.991.1100 <br />CONFIDENTIALITY NOTICE: The contents of this email message and any attachments are intended solely for the <br />addressee(s) and may contain confidential and/or privileged information and may be legally protected from disclosure. If you are <br />a client please consider its contents before forwarding to a third party. <br />If you have received this message in error, please (1) do not open any attachments, (2) reply to the sender that you have <br />received this message in error, and (3) delete this message. <br />
The URL can be used to link to this page
Your browser does not support the video tag.