Laserfiche WebLink
MW-3 <br /> IL -o <br /> MP-6 <br /> 1 <br /> 1 11 <br /> N Remediation I G <br /> (f1 System I m <br /> f MP-5 r <br /> p0 VW-1 A o- - - - <br /> 1 O�bI i IAS-1 1 G <br /> O i MW-1 1 MP-4 <br /> tA� o <br /> � MW-6� � <br /> \ VYJ-2 \ 1 <br /> \\ IAS-213t _3 1 <br /> \ MP-2 <br /> ` - - - - - - - -- 4 1 <br /> d 1 <br /> MP-1 MW-4 <br /> MW-5+ MP-3 + <br /> 2 rr <br /> \ LEGEND <br /> ° Proposed Dual Phase Extraction Well Location <br /> Monitoring Well Location <br /> �- Soil Vapor Extraction Well Location <br /> NORTH X Air Sparge Well Location <br /> 0 40 80 ® _ .— _ .— Approximate Site Boundary <br /> Approximate Scale — — — — — — — Underground Trenching <br /> 1 inch = 40 feet ❑ Junction Box <br /> DRAWN er: N. Rouillard PROPOSED MULTI-PHASE FIGURE <br /> DATE: 4/26/22 EXTRACTION TRENCH LAYOUT <br /> REVISIONS 4APEX McBillin Real Estate Investment Property <br /> ENVIROTECH, INC. 2154 South El Dorado Street PROJECT NUMBER: <br /> Stockton, California MBR52,001 <br />