My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION 5/25
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION 5/25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2025 11:48:33 AM
Creation date
9/11/2025 3:59:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FINAL INITIAL STUDY/MITIGATED NEGATIVE DECLARATION 5/25
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HCS Two-Lane Highway Report <br />Project Information <br />Analyst Alyssa Labrador Date 12/23/2024 <br />Agency W-Trans Analysis Year 2024 <br />Jurisdiction San Joaquin County Time Analyzed 3 - SR-88 btwn E Harney <br />Ln & 8 Mile Rd - F+P PM <br />NB <br />Project Description SJX015 Units U.S. Customary <br />Segment 1 <br />Vehicle Inputs <br />Segment Type Passing Zone Length, ft 16368 <br />Lane Width, ft 12 Shoulder Width, ft 6 <br />Speed Limit, mi/h 55 Access Point Density, pts/mi 10.0 <br />Demand and Capacity <br />Directional Demand Flow Rate, veh/h 451 Opposing Demand Flow Rate, veh/h 461 <br />Peak Hour Factor 1.00 Total Trucks, %3.45 <br />Segment Capacity, veh/h 1700 Demand/Capacity (D/C)0.27 <br />Intermediate Results <br />Segment Vertical Class 1 Free-Flow Speed, mi/h 60.1 <br />Speed Slope Coefficient (m)3.68050 Speed Power Coefficient (p)0.48748 <br />PF Slope Coefficient (m)-1.26170 PF Power Coefficient (p)0.76689 <br />In Passing Lane Effective Length?No Follower Density, followers/mi/ln 3.9 <br />%Improvement to Percent Followers 0.0 %Improvement to Speed 0.0 <br />Subsegment Data <br />#Segment Type Length, ft Radius, ft Superelevation, %Average Speed, mi/h <br />1 Tangent 16368 --57.9 <br />Vehicle Results <br />Average Speed, mi/h 57.9 Percent Followers, %49.6 <br />Segment Travel Time, minutes 3.21 Adj. Follower Density, followers/mi/ln 3.9 <br />Vehicle LOS B <br />Facility Results <br />T VMT <br />veh-mi/AP <br />VHD <br />veh-h/p <br />Follower Density, followers/ <br />mi/ln <br />LOS <br />1 350 0.22 3.9 B <br />Copyright © 2025 University of Florida. All Rights Reserved.HCSâ„¢Highways Version 2024 Generated: 01/13/2025 15:06:21 <br />3 - F+P PM (NB).xuf
The URL can be used to link to this page
Your browser does not support the video tag.