Laserfiche WebLink
NC Landfill Baseline Condition 3/9/2025 <br />Results (Continued) <br />Year <br />(Mg/year)(m 3 /year)(short tons/year) (Mg/year)(m 3 /year)(short tons/year) <br />1991 0 00000 <br />1992 1.160E+02 6.339E+04 1.276E+02 2.727E-01 7.607E+01 2.999E-01 <br />1993 5.236E+02 2.860E+05 5.760E+02 1.230E+00 3.433E+02 1.353E+00 <br />1994 9.793E+02 5.350E+05 1.077E+03 2.301E+00 6.420E+02 2.531E+00 <br />1995 1.515E+03 8.277E+05 1.667E+03 3.560E+00 9.932E+02 3.916E+00 <br />1996 1.863E+03 1.018E+06 2.049E+03 4.377E+00 1.221E+03 4.815E+00 <br />1997 2.175E+03 1.188E+06 2.392E+03 5.110E+00 1.426E+03 5.621E+00 <br />1998 2.496E+03 1.364E+06 2.746E+03 5.865E+00 1.636E+03 6.452E+00 <br />1999 2.819E+03 1.540E+06 3.101E+03 6.623E+00 1.848E+03 7.286E+00 <br />2000 3.101E+03 1.694E+06 3.411E+03 7.287E+00 2.033E+03 8.016E+00 <br />2001 3.378E+03 1.845E+06 3.716E+03 7.938E+00 2.214E+03 8.731E+00 <br />2002 3.763E+03 2.056E+06 4.140E+03 8.843E+00 2.467E+03 9.728E+00 <br />2003 4.168E+03 2.277E+06 4.585E+03 9.795E+00 2.733E+03 1.077E+01 <br />2004 4.556E+03 2.489E+06 5.012E+03 1.071E+01 2.987E+03 1.178E+01 <br />2005 5.015E+03 2.740E+06 5.516E+03 1.178E+01 3.287E+03 1.296E+01 <br />2006 5.511E+03 3.011E+06 6.062E+03 1.295E+01 3.613E+03 1.424E+01 <br />2007 6.000E+03 3.278E+06 6.600E+03 1.410E+01 3.933E+03 1.551E+01 <br />2008 6.439E+03 3.517E+06 7.083E+03 1.513E+01 4.221E+03 1.664E+01 <br />2009 6.784E+03 3.706E+06 7.462E+03 1.594E+01 4.447E+03 1.753E+01 <br />2010 7.120E+03 3.889E+06 7.832E+03 1.673E+01 4.667E+03 1.840E+01 <br />2011 7.424E+03 4.056E+06 8.166E+03 1.744E+01 4.867E+03 1.919E+01 <br />2012 7.717E+03 4.216E+06 8.489E+03 1.813E+01 5.059E+03 1.995E+01 <br />2013 8.021E+03 4.382E+06 8.823E+03 1.885E+01 5.258E+03 2.073E+01 <br />2014 8.374E+03 4.575E+06 9.212E+03 1.968E+01 5.490E+03 2.165E+01 <br />2015 8.760E+03 4.786E+06 9.636E+03 2.059E+01 5.743E+03 2.264E+01 <br />2016 9.291E+03 5.076E+06 1.022E+04 2.183E+01 6.091E+03 2.401E+01 <br />2017 9.662E+03 5.278E+06 1.063E+04 2.270E+01 6.334E+03 2.497E+01 <br />2018 1.008E+04 5.508E+06 1.109E+04 2.369E+01 6.610E+03 2.606E+01 <br />2019 1.052E+04 5.748E+06 1.157E+04 2.473E+01 6.898E+03 2.720E+01 <br />2020 1.095E+04 5.981E+06 1.204E+04 2.573E+01 7.177E+03 2.830E+01 <br />2021 1.134E+04 6.194E+06 1.247E+04 2.664E+01 7.433E+03 2.931E+01 <br />2022 1.181E+04 6.452E+06 1.299E+04 2.775E+01 7.742E+03 3.053E+01 <br />2023 1.223E+04 6.682E+06 1.345E+04 2.874E+01 8.018E+03 3.162E+01 <br />2024 1.287E+04 7.031E+06 1.416E+04 3.024E+01 8.437E+03 3.327E+01 <br />2025 1.344E+04 7.342E+06 1.478E+04 3.158E+01 8.811E+03 3.474E+01 <br />2026 1.402E+04 7.661E+06 1.543E+04 3.295E+01 9.193E+03 3.625E+01 <br />2027 1.462E+04 7.987E+06 1.608E+04 3.436E+01 9.585E+03 3.779E+01 <br />2028 1.523E+04 8.321E+06 1.676E+04 3.579E+01 9.986E+03 3.937E+01 <br />2029 1.586E+04 8.664E+06 1.744E+04 3.726E+01 1.040E+04 4.099E+01 <br />2030 1.650E+04 9.014E+06 1.815E+04 3.877E+01 1.082E+04 4.265E+01 <br />2031 1.716E+04 9.374E+06 1.887E+04 4.032E+01 1.125E+04 4.435E+01 <br />2032 1.783E+04 9.742E+06 1.962E+04 4.190E+01 1.169E+04 4.609E+01 <br />2033 1.852E+04 1.012E+07 2.038E+04 4.353E+01 1.214E+04 4.788E+01 <br />2034 1.923E+04 1.051E+07 2.116E+04 4.520E+01 1.261E+04 4.971E+01 <br />2035 1.996E+04 1.090E+07 2.196E+04 4.690E+01 1.309E+04 5.159E+01 <br />2036 2.071E+04 1.131E+07 2.278E+04 4.866E+01 1.357E+04 5.352E+01 <br />2037 2.147E+04 1.173E+07 2.362E+04 5.046E+01 1.408E+04 5.550E+01 <br />2038 2.226E+04 1.216E+07 2.448E+04 5.230E+01 1.459E+04 5.753E+01 <br />2039 2.306E+04 1.260E+07 2.537E+04 5.420E+01 1.512E+04 5.962E+01 <br />2040 2.389E+04 1.305E+07 2.628E+04 5.614E+01 1.566E+04 6.176E+01 <br />NMOCCarbon dioxide <br />REPORT - 10