Laserfiche WebLink
NC Landfill Project Condition 3/9/2025 <br />Results (Continued) <br />(Mg/year)(m 3 /year)(short tons/year) (Mg/year)(m 3 /year)(short tons/year) <br />2092 2.721E+04 2.179E+07 2.993E+04 7.269E+03 1.090E+07 7.996E+03 <br />2093 2.667E+04 2.136E+07 2.934E+04 7.125E+03 1.068E+07 7.837E+03 <br />2094 2.615E+04 2.094E+07 2.876E+04 6.984E+03 1.047E+07 7.682E+03 <br />2095 2.563E+04 2.052E+07 2.819E+04 6.845E+03 1.026E+07 7.530E+03 <br />2096 2.512E+04 2.012E+07 2.763E+04 6.710E+03 1.006E+07 7.381E+03 <br />2097 2.462E+04 1.972E+07 2.709E+04 6.577E+03 9.858E+06 7.235E+03 <br />2098 2.414E+04 1.933E+07 2.655E+04 6.447E+03 9.663E+06 7.091E+03 <br />2099 2.366E+04 1.894E+07 2.602E+04 6.319E+03 9.472E+06 6.951E+03 <br />2100 2.319E+04 1.857E+07 2.551E+04 6.194E+03 9.284E+06 6.813E+03 <br />2101 2.273E+04 1.820E+07 2.500E+04 6.071E+03 9.100E+06 6.679E+03 <br />2102 2.228E+04 1.784E+07 2.451E+04 5.951E+03 8.920E+06 6.546E+03 <br />2103 2.184E+04 1.749E+07 2.402E+04 5.833E+03 8.744E+06 6.417E+03 <br />2104 2.141E+04 1.714E+07 2.355E+04 5.718E+03 8.571E+06 6.290E+03 <br />2105 2.098E+04 1.680E+07 2.308E+04 5.605E+03 8.401E+06 6.165E+03 <br />2106 2.057E+04 1.647E+07 2.262E+04 5.494E+03 8.234E+06 6.043E+03 <br />2107 2.016E+04 1.614E+07 2.218E+04 5.385E+03 8.071E+06 5.923E+03 <br />2108 1.976E+04 1.582E+07 2.174E+04 5.278E+03 7.912E+06 5.806E+03 <br />2109 1.937E+04 1.551E+07 2.131E+04 5.174E+03 7.755E+06 5.691E+03 <br />2110 1.899E+04 1.520E+07 2.088E+04 5.071E+03 7.601E+06 5.578E+03 <br />2111 1.861E+04 1.490E+07 2.047E+04 4.971E+03 7.451E+06 5.468E+03 <br />2112 1.824E+04 1.461E+07 2.007E+04 4.872E+03 7.303E+06 5.360E+03 <br />2113 1.788E+04 1.432E+07 1.967E+04 4.776E+03 7.159E+06 5.253E+03 <br />2114 1.753E+04 1.403E+07 1.928E+04 4.681E+03 7.017E+06 5.149E+03 <br />2115 1.718E+04 1.376E+07 1.890E+04 4.589E+03 6.878E+06 5.048E+03 <br />2116 1.684E+04 1.348E+07 1.852E+04 4.498E+03 6.742E+06 4.948E+03 <br />2117 1.651E+04 1.322E+07 1.816E+04 4.409E+03 6.608E+06 4.850E+03 <br />2118 1.618E+04 1.295E+07 1.780E+04 4.321E+03 6.477E+06 4.754E+03 <br />2119 1.586E+04 1.270E+07 1.744E+04 4.236E+03 6.349E+06 4.659E+03 <br />2120 1.554E+04 1.245E+07 1.710E+04 4.152E+03 6.223E+06 4.567E+03 <br />2121 1.524E+04 1.220E+07 1.676E+04 4.070E+03 6.100E+06 4.477E+03 <br />2122 1.493E+04 1.196E+07 1.643E+04 3.989E+03 5.979E+06 4.388E+03 <br />2123 1.464E+04 1.172E+07 1.610E+04 3.910E+03 5.861E+06 4.301E+03 <br />2124 1.435E+04 1.149E+07 1.578E+04 3.833E+03 5.745E+06 4.216E+03 <br />2125 1.406E+04 1.126E+07 1.547E+04 3.757E+03 5.631E+06 4.133E+03 <br />2126 1.379E+04 1.104E+07 1.516E+04 3.682E+03 5.520E+06 4.051E+03 <br />2127 1.351E+04 1.082E+07 1.486E+04 3.610E+03 5.410E+06 3.971E+03 <br />2128 1.325E+04 1.061E+07 1.457E+04 3.538E+03 5.303E+06 3.892E+03 <br />2129 1.298E+04 1.040E+07 1.428E+04 3.468E+03 5.198E+06 3.815E+03 <br />2130 1.273E+04 1.019E+07 1.400E+04 3.399E+03 5.095E+06 3.739E+03 <br />2131 1.247E+04 9.989E+06 1.372E+04 3.332E+03 4.994E+06 3.665E+03 <br />Year Total landfill gas Methane <br />REPORT - 9