My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec <br /> consultants <br /> 6. SCHEDULE AND REPORTING <br /> Upon DTSC and CVRWQCB approval of this 2022 GMWP, the drilling contractor will be <br /> scheduled for the three new proposed monitoring wells. If approval is received by August 15, <br /> then monitoring well installations and the 2022 groundwater monitoring event will take place <br /> before the end of the third quarter 2022. The results of the 2022 monitoring event and the <br /> documentation of the new monitoring well installations will be provided in the 2022 Annual <br /> Groundwater Monitoring Report, which will be submitted to DTSC and the CVRWQCB within <br /> 90 days of completion of the 2022 groundwater monitoring field activities. The 2022 Annual <br /> Groundwater Monitoring Report will include summary tables of the groundwater results, figures <br /> with posted cis-1,2-DCE and VC results and isoconcentration contours developed based on the <br /> professional judgement of a California licensed Professional Geologist, updated hydrographs, <br /> updated head difference graphs, groundwater monitoring well VOC concentration over time <br /> graphs, and concentration trends for COCs with eight or more samples in the last 20 years that <br /> were sampled during the 2022 monitoring event. The 2022 laboratory reports will be uploaded to <br /> GeoTracker when the 2022 Annual Groundwater Monitoring Report is submitted to DTSC and <br /> CVRWQCB. <br /> RRI Groundwater Monitoring Work Plan 21 June 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.