Laserfiche WebLink
ffN <br /> W-105 <br /> Building214 <br /> r------ _ ___ - _ _ p. W 020 W-079 W-104 <br /> Building 314 f - P-177 P 173 W-078 <br /> P 178 -004 W-080 <br /> PMW 02/-W 333 VV-058 <br /> / . <br /> / W-106 <br /> •.W-112 <br /> / W-214 <br /> W-109 <br /> -215 <br /> 1 <br /> Legend Notes <br /> VV_099=Well ID W-334 <br /> Monitoring Well(will be gauged in 3Q22) VOCs=Volatile Organic Compounds <br /> Monitoring Well(will be sampled for W-110 75 37.5 0 75 Feet <br /> VOCs in 3Q22) <br /> Piezometer(will be gauged in 3Q22) _ - <br /> Piezometer(will be sampled for <br /> VOCs in 3Q22) { Site 4 Sampling Locations <br /> - cis-1,2-DCE concentration greater W-216 <br /> � 2022 Groundwater Monitoring Work Plan <br /> nthan 6 Ng/L dashed where inferred '. W-218 Rough and Ready Island,Port of Stockton <br /> Vinyl Chloride concentration greater '•LJ.r Stockton,California <br /> R than 0.5 Ng/L-dashed where inferred <br /> Drainage Channel Geosyntec <br /> Figure <br /> 1--1 Approximate Excavation Area _ <br /> - Contamination Sites Building 216 I rj consultants <br /> u 25 <br /> Imagery Source.-GoogleEar[h,2018 '� _ Project No.:WR2501 B June 2022 <br />