My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec'� <br /> consultants <br /> lithology encountered at RRI, as described in the GMWP. Soils will be logged using the <br /> Unified Soils Classification System (USCS) and all downhole equipment will be <br /> decontaminated prior to use. The filter pack and slot size may be modified from the SOP <br /> based on the lithology encountered in the field. The replacement well locations as shown <br /> in Figure 1 are preliminary, and may be modified based on future discussions with DTSC <br /> and CVRWQCB prior to the well installations. After a minimum of 48 hours following <br /> each well installation,the new monitoring wells will be developed in accordance with the <br /> SOP. <br /> 3. SCHEDULE AND REPORTING <br /> The CVRWQCB has previously provided authorization to proceed with destroying the <br /> monitoring wells in the rail line construction area. Monitoring wells in the rail line <br /> construction area were sampled for VOCs on April 5 through 7, 2021 as per discussion <br /> with DTSC in the March 18, 2021 meeting. Following approval of this Work Plan by <br /> DTSC and receipt of all necessary permits the wells listed on Table 1 and shown in Figure <br /> 1 will be destroyed. The well destructions are anticipated to be conducted in June and <br /> July 2021, the replacement well installations in May and June 2022, and sampling of the <br /> replacement wells in the 3rd Quarter 2022 as part of the 2022 annual groundwater <br /> monitoring event. A separate memorandum will be submitted in 2022 with the proposed <br /> 2022 groundwater monitoring plan for RRI. The schedule listed above may be modified <br /> pending modifications to the rail line construction schedule. The sampling results and <br /> documentation of the well destructions will be included in the 2021 Annual Groundwater <br /> Monitoring Report. The installation and sampling of the replacement monitoring wells <br /> will be included in the 2022 Annual Groundwater Monitoring Report. <br /> 4. REFERENCES <br /> Department of Water Resources (DWR), 1991. California Well Standards. Bulletin 74- <br /> 90. June. <br /> Geosyntec Consultants, Inc. (Geosyntec), 2018. Groundwater Monitoring Work Plan, <br /> Rough and Ready Island, Port of Stockton, Stockton, California. 1 June revision. <br /> Geosyntec, 2019. Groundwater Monitoring Work Plan Addendum, 2019 Plan. May 20 <br /> Rail Line Well Destruction Work Plan 3 April 27,2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.