My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRAFT <br /> Geosyntec <br /> consultants <br /> 17. CONFINED SPACE ENTRY <br /> ❑ APPLICABLE ® NOT APPLICABLE <br /> The task(s) for this project involve confined-space entry. Workers must abide by the company's <br /> Confined Space Entry Program(Procedure HS 118). <br /> 18. GLOBALLY-HARMONIZED SYSTEM FOR HAZARD COMMUNICATION <br /> ® APPLICABLE ❑ NOT APPLICABLE <br /> The following procedures must be followed for chemicals brought onto the site by Geosyntec <br /> personnel or by subcontractors (i.e., decontamination solution, sampling preservatives, KB-1® <br /> solution, sodium permanganate, etc.)while performing the tasks of this project: <br /> • Labels on primary chemical containers must not be defaced; <br /> • Chemicals must be stored in appropriate storage containers; <br /> • Secondary containers and storage cabinets must be correctly and clearly labeled; <br /> • Chemicals incompatible with each other must not be stored together; <br /> • Workers must receive training on the chemical hazards; and <br /> • Safety Data Sheets (SDSs) must be added to Appendix F. <br /> When chemicals are used on-site, workers must abide by Geosyntec's GHS Hazard <br /> Communication Program (Procedure HS 115). <br /> 19. HASP AMENDMENTS <br /> Over the course of this project, it is possible that the project-specific hazards and working <br /> conditions will change. This HASP may be reviewed and amended as necessary to effectively <br /> describe the changing working conditions and measures to mitigate the potential health and <br /> safety issues that may arise during the project. Amendments to the HASP should be briefly <br /> described in the following spaces provided. The full text of the amendments should be provided <br /> in <br /> Port of Stockton HASP 1 12.10-2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.