DRAFT
<br /> B.3. WATER/BOATING HAZARDS ❑Applicable ® Not Applicable,Not Anticipated
<br /> EXPLANATORY NOTES,CLARIFICATIONS:
<br /> OPERATOR OF WATER CRAFT ❑Wear regulatory-approved personal flotation device(PFD)or buoyant work vest.
<br /> OR PASSENGER/WORKER ON ❑Bring emergency rescue equipment(ring buoy,reaching device,flares). Use"reach,throw,row,go"strategy.
<br /> WATER CRAFT OR PLATFORM ❑Use fuel safety practices,fire extinguisher present in boat.
<br /> Hazards:Drowning,hypothermia, ❑Have lifesaving skiff/boat available.
<br /> collision,motor/fuel hazards, ❑Monitor weather,develop float plan,ensure navigation/communication equipment operable.
<br /> navigation ' ❑For tidal,flash flood,dam release hazards,plan/locate work accordingly,other precautions as appropriate.
<br /> WORK NEAR WATER HAZARDS OR ❑Where ice/slip hazards are present adjacent to water body,and for working directly on ice over water,wear ice
<br /> ENTERING WATER creepers,sand work area,or take other appropriate measures to address slip hazard.
<br /> Hazards:drowning,hypothermia ❑For high-hazard work over very cold water,have immersion survival suit available,as appropriate.
<br /> from water immersion,related ❑For electrical hazards associated with water/wet locations,see Section B.8.,"Electrical Hazards."
<br /> injuries.
<br /> ❑Wading,wetland,mud/silt
<br /> ❑Dam release,flash flood,tide Geosyntec Procedure(s):HS-306-Working on/near Water and Ice,
<br /> ❑Diving HS-312-Water Transportation Safety
<br /> ❑Ice on/near water body
<br /> BA. FALL HAZARDS ❑Applicable ® Not Applicable,Not Anticipated
<br /> EXPLANATORY NOTES,CLARIFICATIONS:
<br /> ❑ WORKING AT HEIGHTS(GENERAL) General fall protection requirement thresholds:required @>4'(industry),>6'(construction),>10'(scaffolds)
<br /> Hazards:Falls,overhead hazards, El Ensure guardrails present ❑Restrict access beneath work to protect other
<br /> impalement hazard(such as from ❑Use personal fall apparatus(PFA) site personnel from overhead hazards
<br /> falling onto unprotected rebar and ❑Use tether or positioning device ❑Ensure safe access to elevated work location
<br /> similar) ❑Restrict access to hazard(barriers,tape,sign) (ladder,stair,)
<br /> ❑Ensure covers in place over holes El install caps on protruding rebar
<br /> ❑Use designated"watch person"
<br /> ❑Use fall protection net
<br /> Geosyntec Procedure(s):HS-120-Fall Protection,HS-210-Walking and Working Surfaces
<br /> LADDERS/STAIRS ❑Follow safe work practices:
<br /> ❑ Extension/straight ladders • Use ladders according to safe practices and manufacturer's instructions.
<br /> ❑ Step ladders • Maintain 3 points of contact at all times on ladder;keep center of gravity within side rails.
<br /> ❑ Fixed ladders • Do not use metal(conductive)ladder near electrical hazard.
<br /> ❑ Stairs • Extension/straight ladders shall be properly footed,secured,angled,extend above upper work surface.
<br /> Hazards: Falls,overhead hazards • Stepladders are set on level ground or properly shimmed,spreaders locked;do not climb/stand on top
<br /> step,top cap,or rear non-climbing side;use step ladder of sufficient length for work.
<br /> • Equip stairs with stair-rails where more than 4 steps,and for stairway height 4'or more.
<br /> Geosyntec Procedure(s):HS-501-Ladders
<br /> SCAFFOLD ❑Follow safe work practices:
<br /> ❑Supported scaffold • Identify/coordinate operations with subcontractor's competent person.
<br /> ❑Suspended scaffold • Supported scaffold level,stable,proper attachments,tiebacks,planking,
<br /> ❑Free-standing/mobile scaffold • Suspended scaffolds anchored properly.
<br /> Hazards:Falls,overhead hazards, • Guardrails or personal fall apparatus required above 10 feet.
<br /> equipment collapse. • Proper means of accessing scaffold(proper ladders,stair tower).
<br /> • Total height of free-standing scaffold not to exceed four times the minimum base dimension.
<br /> • Do not exceed load limits;store/stage materials in quantities sufficient for immediate use.
<br /> Geosyntec Procedure(s):HS-507-Scaffolds
<br /> ; AERIAL LIFT ❑Follow safe work practices:
<br /> Hazards:Falls,overhead hazards, Operators to be sufficiently trained,experienced and qualified.
<br /> struck-by,run-over,caught between • Equipment is inspected after mobilization and is in good condition.
<br /> (pinch points),tip over,fluid leaks. • Harness&lanyard worn whenever operating the lift(possible exception for scissor lifts).
<br /> • Overhead and surface obstructions to be reviewed with operators prior to use.
<br /> Geosyntec Procedure(s):HS-509-Aerial Lifts
<br /> IMPORTANT! This work may/will ❑Follow safe work practices per Section B.9.,"Utility Related Hazards"
<br /> include close proximity to overhead
<br /> electric utility lines.
<br /> Geosyntec THA 5 —WELL INSTALLATION> 12.10.2020
<br /> <Rough and Ready Island GWMP,WR2501 B> Page 4