My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geagt�c® <br /> consultants <br /> Appendix D: Air Monitoring <br /> Applies to Task: ❑ O ® OO ❑ 03 ® ® ® OO ® © ❑ OO ❑ <br /> ® Photoionization Detector(PID) ❑ Oxygen (02)Meter ❑ Explosimeter <br /> Brand/Model No.: 10.6 eV: Brand/Model No.: Brand/Model No.: <br /> Monitoring Frequency: Continuous during drilling and Monitoring Frequency: Monitoring Frequency: <br /> sampling <br /> Breathing Zone Action Reading(%) Action Source(%LEL) <br /> Reading(ppm) <br /> ND to 5 Level D PPE Less than 19.5 Stop work.Evacuate the area. Reading Action <br /> to Level C PPE 1 to 10 Continue with caution. <br /> 19.5 to 23.5 Continue to work with caution. <br /> Greater than 5- Stop work.Evacuate the area.If upon <br /> return,levels still exceed the action level, Greater than 10 Stop work.Evacuate the area.If upon <br /> stop work and implement engineering Greater than 23.5 Stop work.Evacuate the area. return,concentration still exceeds 10% <br /> controls. LEL,ventilate until concentration is <br /> back to<10%LEL. <br /> Note: Note: Note: <br /> ❑ Flame Ionization Detector(FID) ❑ Chemical Detector Tube ❑ Other <br /> Brand/Model No.: Brand/Model No.: Brand/Model No.: <br /> Monitoring Frequency: Monitoring Frequency: Monitoring Frequency: <br /> Breathing Zone Action Breathing Zone Action Breathing Zone Action <br /> Reading(ppm) Reading(ppm) Reading <br /> to Level D PPE to Level D PPE to Level D PPE <br /> to Level C PPE to Level C PPE to Level C PPE <br /> Greater than_ Stop work.Evacuate the area.If upon Greater than_ Stop work.Evacuate the area.If upon Greater than_ Stop work.Evacuate the area.If upon <br /> return,levels still exceed ,stop work return,levels still exceed ,stop return,levels still exceed ,stop <br /> and implement engineering controls. work and implement engineering work and implement engineering <br /> controls. controls. <br /> 11LOtL <br /> Note: Note: <br /> Appendix D D-1 26.06.2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.