My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2201
>
2900 - Site Mitigation Program
>
PR0546565
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 12:57:46 PM
Creation date
9/18/2025 8:07:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0546565
PE
2959 - DTSC LEAD AGENCY SITE
FACILITY_ID
FA0025168
FACILITY_NAME
ROUGH AND READY ISLAND, PORT OF STOCKTON
STREET_NUMBER
2201
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2201 WASHINGTON ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
577
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<Chris.Flower@waterboards.ca.gov> <br /> Cc:Anju Wicke<AWicke(@Geosyntec.com>; Kim Huynh <KHuynh(@Geosyntec.com>; Claire Wildman <br /> <CWildman(@Geosyntec.com>; Elena Robertson <Elena.Robertson(@Geosyntec.com>; Port of <br /> Stockton <portofstocktonCcDGeosyntec.com> <br /> Subject: RE: Port of Stockton RRI - Piezometer P-108 Destruction Request <br /> Duane <br /> The P-108 piezometer is not proposed to be relocated. The P-108 piezometer has never been used <br /> as part of the Port's groundwater monitoring program and the Navy annotated P-108 as damaged in <br /> 2000 prior to the property transfer. New monitoring wells for both water level gauging and <br /> groundwater sampling are planned to be installed in this area following remedy implementation. I <br /> have attached the figure from the Rail Line Area Well Destruction Work Plan for reference of the <br /> locations of the proposed replacement wells. <br /> Thanks <br /> Nicole <br /> From: White, Duane@DTSC<Duane.White(d)dtsc.ca.gov> <br /> Sent: Friday, January 27, 2023 9:15 AM <br /> To: Nicole Gotberg<NGotberg(@Geosyntec.com>; Landrum, Carla@Waterboards <br /> <Carla.Landrum(@Waterboards.ca.gov>; Flower, Chris@Waterboards <br /> <Chris.Flower(d)waterboards.ca.gov> <br /> Cc: Anju Wicke <AWicke(@Geos)tntec.com>; Kim Huynh <KHuynh(@Geosyntec.com>; Claire Wildman <br /> <CWildman(@Geosyntec.com>; Elena Robertson <Elena.Robertson CCDGeosyntec.com>; Port of <br /> Stockton <portofstockton(@Geos)lntec.com> <br /> Subject: RE: Port of Stockton RRI - Piezometer P-108 Destruction Request <br /> CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you <br /> recognize the sender and know the content is safe. If you have any suspicion, please confirm with the sender <br /> verbally that this email is authentic. If you suspect fraud, click"Phish Alert Report." <br /> Hello Nicole: <br /> DTSC reviewed the Port of Stockton RRI - Piezometer P-108 Destruction Request <br /> and has the following comments: <br /> 1. Following the remedy implementation, will Piezometer P-108 be relocated at <br /> another location? <br /> 2. Following implementation, the Remedial Action Implementation Report should <br /> include the following: <br /> a. A table showing the actual volume of grout used. <br /> b. The County well destruction permit(s). <br /> c. Completed well destruction forms. <br /> d. Disposal manifests or bills of lading for disposal of destruction derived <br />
The URL can be used to link to this page
Your browser does not support the video tag.