Laserfiche WebLink
Geosynte& <br /> consultants <br /> LIST OF TABLES <br /> Table 1: Planned Well Maintenance Activities <br /> Table 2: Proposed Well Construction Details <br /> Table 3: Groundwater Monitoring Plan <br /> LIST OF FIGURES <br /> Figure 1: Site Location Map <br /> Figure 2: Site Overview <br /> Figure 3: Well Maintenance Work <br /> Figure 4: Monitoring Well Scope <br /> LIST OF APPENDICES <br /> Appendix A: Standard Operating Procedures for Monitoring Well Installation <br /> Appendix B: Standard Operating Procedures for Low-Flow Sampling <br /> Appendix C: Health and Safety Plan <br /> Appendix D: Quality Assurance Project Plan <br /> RRI 2024 Groundwater Monitoring Work Plan iii June 13,2024 <br />