Laserfiche WebLink
North County RC&SL ii Public Works/Solid Waste <br />First Semiannual 2024 Groundwater Monitoring ©2024 COUNTY of San Joaquin. All Rights Reserved. <br />TABLES__________________________________________________ <br /> <br />Table 1 First Semiannual 2024 Monthly Refuse Disposal <br />Table 2 First Semiannual 2024 Leachate Field Measurements <br />Table 3 First Quarter 2024 Groundwater Monitoring Results <br />Table 4 Second Quarter 2024 Groundwater Monitoring Results <br />Table 5 First Quarter 2024 Surface Water Monitoring Results <br />Table 6 Unsaturated Zone Soil Pore Gas Monitoring Results, First Semiannual 2024 <br />Table 7 Leachate Monitoring Summary, First Semiannual 2024 <br />Table 8 Lysimeter Monitoring Summary, First Semiannual 2024 <br /> <br /> <br />FIGURES_________________________________________________ <br /> <br />Figure 1 Site Vicinity Map <br />Figure 2 Site Map with Area of Fill <br />Figure 3 Groundwater Contour Map, First Quarter 2024 <br />Figure 4 Groundwater Contour Map, Second Quarter 2024 <br /> <br /> <br />APPENDICES______________________________________________ <br /> <br />Appendix A Sampling and Analysis Procedures <br />Appendix B Water Sample Field Data Sheets <br />Appendix C Laboratory Certification <br />Appendix D Statistical Methods to Determine Concentration Limits <br />Appendix E Tabular Summary of Historical Monitoring Data <br />Appendix F Groundwater Direction and Flow Rate Calculations <br />Appendix G Unsaturated Zone Soil Pore Gas Tabular Summary of Historical Monitoring Data <br />Appendix H Standard Observations <br />Appendix I Historical Time Series Plots <br />