My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD APPENDIX A -L 2024
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARNEY
>
17720
>
4400 - Solid Waste Program
>
PR0440058
>
COMPLIANCE INFO_JTD APPENDIX A -L 2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2026 12:59:39 PM
Creation date
9/24/2025 1:34:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD APPENDIX A -L 2024
RECORD_ID
PR0440058
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004518
FACILITY_NAME
NORTH COUNTY LANDFILL
STREET_NUMBER
17720
Direction
E
STREET_NAME
HARNEY
STREET_TYPE
LN
City
LODI
Zip
95240
APN
06512004
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
17720 E HARNEY LN LODI 95240
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2247
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Form 2 Monthly Visual Observations Form 2 – Page 1 of 2 Facility Name: San Joaquin County North County Landfill Month and Year: Name of the observer: Scheduled facility operating hours: M – F 7AM – 4PM; Sat. 8AM – 4PM Date and time of the observation: Must be performed during daylight and during normal scheduled facility operating hours Outfall Observations for NSWDs: Outfall Name Is there a NSWD or indications of a recent NSWD? (Yes / No) If yes, answer the following: Describe the source of the NSWD If it was unauthorized, was it discontinued? (Yes / No) If it is authorized, describe the BMPs in place to ensure that it does not mobilize or contain pollutants, or cause erosion. Is it unauthorized? Is it authorized? SW-3 SW-4 Corrective Actions Needed for NSWDs: Corrective Actions Taken for NSWDs: Describe corrective actions needed to eliminate or control NSWDs: Describe the corrective actions that were taken as a result of the NSWDs: At least once per calendar month, the Discharger shall visually observe each drainage area for the following: 1) the presence or indications of unauthorized NSWDs and their sources; 2) authorized NSWDs, their sources, and BMPs to address them; and 3) outdoor industrial equipment and storage areas, industrial activities, BMPs, and all other potential sources of industrial pollutants. NSWD = Non-Storm Water Discharge; authorized NSWDs are listed in Section IV (pages 19-20) of the IGP.
The URL can be used to link to this page
Your browser does not support the video tag.