My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
4607
>
2300 - Underground Storage Tank Program
>
PR0543692
>
INSTALL_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2025 9:52:56 AM
Creation date
9/25/2025 12:11:52 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2025
RECORD_ID
PR0543692
PE
2351 - UST FACILITY - 2481 COMPLIANT
FACILITY_ID
FA0024830
FACILITY_NAME
ARCO
STREET_NUMBER
4607
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17746013
CURRENT_STATUS
Temp inactive, non-billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
4607 S AIRPORT WAY STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If you have received this message in error,please (1)do not open any attachments, (2)reply to the sender that you have received this <br /> message in error, and(3) delete this message. <br /> From:Tahtia Pearce <br /> Sent:Thursday,April 3, 2025 11:29 AM <br /> To: WB-DWQ-OTTL<OTTL.OTTL@waterboards.ca.gov> <br /> Cc: ust@slgov.org;Ariel Barrantes<ariel@tccontractors.com>; Mark Z Farmer<Mark@tccontractors.com>; Chris <br /> Murphy<CMurphv@cgrs.com>; Richard Thomas<RThomas@cgrs.com> <br /> Subject:Test Notify for 4607 S.Airport Way-Stockton: Friday,04/11/2025 @ 8am <br /> Good morning all, <br /> Please find attached notification and general contractors' statement for final ELD testing at the subject <br /> site. If you have any questions or concerns, please feel free to reach out via email, phone, or text. <br /> The general contractor acknowledges that: <br /> • No further ground penetrating work is to be performed, including beautification <br /> requirements, atop or immediately adjacent to the UST system after final ELD testing. <br /> • ALL tank top trim needs to be completed. <br /> • ALL secondaries must be reachable and accessible. <br /> • ALL tanks be empty of ballast (water)and must be mopped and dry. <br /> If you have any questions or concerns, please feel free to reach out to us. <br /> Thank you. <br /> Tahtia Pearce <br /> ELD Project Coordinator CGRS <br /> Mobile 916.616.2233 1 916.991.1100 56t-U716N5 DEUVERE6 <br /> CONFIDENTIALITY NOTICE. The contents of this email message and any attachments are intended solely for the addressee(s)and <br /> may contain confidential and/or privileged information and may be legally protected from disclosure. If you are a client please consider <br /> its contents before forwarding to a third party. <br /> If you have received this message in error,please(1)do not open any attachments, (2)reply to the sender that you have received this <br /> message in error, and(3) delete this message. <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.