Laserfiche WebLink
Enclosure 1. Partial Log of Forward Email Communications with CDCR and DGS <br /> Date Item From To Comment <br /> monitoring via the <br /> SOW. <br /> 10.30.2020 Email Hook Frederick, et I will have to look back <br /> al. through the records to <br /> find work plans for the <br /> well installations if <br /> those are needed for this <br /> agreement. There were <br /> covered by prior <br /> agreements with CDCR. <br /> Can we reference those <br /> instead? The existing <br /> wells are monitored in <br /> accordance with R5- <br /> 2014-0006. Regarding <br /> the last point, we do not <br /> want to limit access to <br /> the AOI's. Those are <br /> potential/proposed areas <br /> that may be modified or <br /> expanded upon once we <br /> have this agreement <br /> ironed out and we can <br /> meet with the facility <br /> environmental staff to <br /> review information <br /> about locations of the <br /> dry cleaning/laundry <br /> facility, the water <br /> treatment facility, the <br /> septic and other water <br /> disposal facilities. <br /> When we discussed this <br /> last year, Tony <br /> suggested we provide <br /> the Study Area figure to <br /> make sure we didn't <br /> inadvertently limit <br /> things in theagreement. <br /> 11.10.2020 Email Frederick Hook, et al. Attached is the final <br /> draft with language <br /> added by the State's <br /> Public Works Board <br /> (PWB). There are two <br /> 16 <br />