My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER R5-2015-0058-01 -44- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOOTHILL SANITARY LANDFILL, INC. <br />FOOTHILL LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br />classification of the solids before the discharge; <br />d. Inspect the liner system for damaged within 30 days of the sediment and <br />solid removal; <br />e. Repair any damage of the liner system within 60 days prior to the <br />discharge of additional waste; and <br />f. Submit a report to the Central Valley Water Board within 30 days of <br />completion of the liner inspection or repair. <br />5. The Action Leakage Rate (ALR) for each Class II surface impoundment is as <br />follows: <br />Surface Impoundment ID Calaveras SI <br />Area (acres) 1.5 <br />Action Leakage Rate (gpad) 1,000 <br />Notification Level (gpd)1 <br />(33% of ALR) 495 <br />Evaluation Monitoring Trigger (gpd)1 <br />(66% of ALR) 990 <br />Corrective Action Level (gpd)1 <br />(100% at ALR) 1,500 <br /> Note: <br /> 1. Gallons per day (gpd) shall be measured by a calibrated flow totalizer. <br />a. If leakage generation in the LCRS or leak detection layer of a Class II <br />surface impoundment exceeds the Notification Level, the Discharger <br />shall: <br />i. Submit written notification within seven days that includes <br />historical and graphical information which describes how the <br />leakage in the Class II surface impoundment has increased <br />over time to reach the Notification Level. <br />ii. Discuss any noticeable increases in leakage rates that may <br />indicate a significant defect has developed in the primary liner. <br />b. If leachate generation in the LCRS or leak detection layer of a Class II <br />surface impoundment exceeds the Evaluation Monitoring Trigger, the <br />Discharger shall: <br />i. Immediately notify Central Valley Water Board staff by <br />telephone and email. <br />ii. Submit written notification within seven days with an evaluation <br />monitoring plan that proposes increased monitoring and <br />reporting of the LCRS or leak detection layer and unsaturated <br />zone, and a contingency plan for how the facility will operate if <br />the pond level reaches the Corrective Action Level.
The URL can be used to link to this page
Your browser does not support the video tag.