My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WASTE DISCHARGE REQUIREMENTS ORDER R5-2015-0058-01 -46- <br />SAN JOAQUIN COUNTY DEPARTMENT OF PUBLIC WORKS <br />FOOTHILL SANITARY LANDFILL, INC. <br />FOOTHILL LANDFILL <br />SAN JOAQUIN COUNTY <br /> <br />d. Complete repairs of the containment structures in accordance with the approved <br />time schedule. <br />7. The Discharger shall update the water balance model if additional inflows <br />are discharged to the Class II surface impoundment such that the model <br />assumptions no longer represent site conditions. <br />8. If the level in the Class II surface impoundment reaches 30-inches (2.5 feet) <br />of freeboard, the Discharger shall immediately notify Central Valley Water <br />Board staff by telephone and email with the Class II surface impoundment <br />water level and the proposed actions to prevent the Class II surface <br />impoundment from reaching pass the 24-inches (2 feet) freeboard limit. <br />9. The Discharger shall comply with all Standard Facility Specifications listed <br />in Section E of the SPRRs dated January 2012 which are part of this Order. <br />D. CONSTRUCTION SPECIFICATIONS <br />Landfill Liner <br />1. LF-2 expansion modules shall, at a minimum, be constructed in accordance with <br />the following engineered alternative design (EAD), from top to bottom: 14 <br /> <br />Component Base Liner Side Slopes <br /> Excavation LF-1/LF-2 <br />Interface <br />Operations Layer ≥ 2 feet soil <br />Filter Fabric Geotextile1 <br /> <br />Geocomposite2 <br /> <br />LCRS <br />9-inch gravel layer <br />Appropriately-sized HDPE <br />collection piping in drainage <br />troughs <br /> <br />14. Incorporates EAD approved under previous WDRs and Title 27 containment system requirements for <br />side slope extensions overlapping an existing MSW landfill (i.e., LF-1).
The URL can be used to link to this page
Your browser does not support the video tag.