Laserfiche WebLink
Permit Unit Requirements for N-4070-1-10 (continued) Page 8 of 9 <br />PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br />These terms and conditions are part of the Facility-wide Permit to Operate. <br />Facility Name: FOOTHILL SANITARY LANDFILL <br />Location: 6484 N WAVERLY RD,LINDEN, CA <br />N-4070-1-10 : Jan 9 2023 2:37PM -- YOSHIMUJ <br />73. Permittee shall maintain keep records of the continuous flare combustion temperature measurements, and the <br />continuous volumetric landfill gas flow rate measurements, when landfill gas is delivered to the flare. Permittee shall <br />also keep a daily and an annual record of the quantity of landfill gas processed in the flare. [District Rules 1070 and <br />2201] <br />74. All records shall be retained for a period of at least five years and shall be made available for District inspection upon <br />request. [District Rules 1070, 2201, 40 CFR 60 Subpart WWW, and 40 CFR 60 Subpart AAAA] <br />75. Landfill collection and control system must be operated continuously such that methane emission from the landfill do <br />not exceed instantaneous or integrated limit requirements. [17 CCR 95464] <br />76. Landfill gas collection system wellheads must be operated under vacuum. Monthly monitoring of wellheads is <br />required. Landfill gas collection system wellheads may be operated under neutral or positive pressure when there is a <br />fire or during other times as allowed in sections 95464(c), 95464(d), and 95464(e) [17 CCR 95464] <br />77. Landfill gas collection system components downstream of blower have a leak limit of 500 ppmv as methane. <br />Components must be checked quarterly. If compliance with the methane limit has been demonstrated for 4 <br />consecutive quarters, then the component checking frequency shall be annually. If an annual test fails to show <br />compliance, quarterly testing shall resume. [17 CCR 95464] <br />78. The enclosed flare must have automatic dampers, an automatic shutdown device, a flame arrester, and continuous <br />recording temperature sensors. [17 CCR 95464] <br />79. The enclosed flare must operate within the parameter ranges established during the initial or most recent source test. <br />[17 CCR 95464] <br />80. Landfill collection and control system must be operated such that landfill surface methane emissions shall not exceed <br />instantaneous surface emission limit of 500 ppmv as methane or integrated surface emission limit of 25 ppmv as <br />methane. [17 CCR 95464 and 17 CCR 95465] <br />81. Instantaneous and integrated landfill surface emissions measurements shall be done quarterly. The landfill may <br />monitor annually provided they comply with requirements of 17 CCR 95469(a)(1) and (b)(3). [17 CCR 95469] <br />82. Permittee shall monitor the landfill gas control system using the procedures specified in 17 CCR 95469(b)(1) through <br />(b)(3). [District Rule 17 CCR 95469] <br />83. Permittee shall monitor each individual wellhead monthly to determine the gauge pressure. If there are any positive <br />pressure reading, other than provided in 17 CCR 95469(d) and (e), the permittee shall take corrective action as <br />specified in 17 CCR 95469(c)(1) through (c)(3). [17 CCR 95469] <br />84. Permittee shall keep records of all gas collection system downtime exceeding five days, including individual well <br />shutdown and disconnection times and the reason for downtime. [17 CCR 95470] <br />85. Permittee shall keep records of all flare downtime in excess of one hour when landfill gas is delivered to the flare, the <br />reason for the downtime and the length of time the flare was shutdown. [17 CCR 95470] <br />86. Permittee shall keep records of the expected gas generation flow rate calculated pursuant to section 95471(e). [17 CCR <br />95470] <br />87. Permittee shall keep records of all instantaneous surface readings of 200 ppmv or greater; all exceedances of the limits <br />in sections 95464(b)(1)(B) or 95465, including the location of the leak (or affected grid), leak concentration in ppmv, <br />date and time of measurement, the action taken to repair the leak, date of repair, any required re-monitoring and the re- <br />monitored concentration in ppmv, and wind speed during surface sampling; and the installation date and location of <br />each well installed as part of a gas collection system expansion. [17 CCR 95470] <br />88. Permittee shall keep records of any positive wellhead gauge pressure measurements, the date of the measurements, the <br />well identification number, and the corrective action taken. [17 CCR 95470] <br />89. Permittee shall terminate surface emission testing when the measured average wind speed is over 15 mph or the <br />instantaneous wind speed is over 30 mph. [17 CCR 95468, 17 CCR 95471]