Laserfiche WebLink
Item Description Units Unit Price Quantity Total Cost <br />1E-1 Final Closure Engineering and Design <br />Components: Preparation of Final Closure Plans and Specifications, Final CQA Plan, Engineering, <br />Management and Bid Documents Preparation <br />Project Manager/Senior Engineer hr.224.00$ 200 44,800$ <br />Design Engineer hr.184.00$ 600 110,400$ <br />AutoCAD hr.90.00$ 400 36,000$ <br />Expenses ls 12,000$ 1 12,000$ <br />Subtotal, Final Closure Engineering and Design 203,200$ <br />1E-2 Final CQA Monitoring and Reporting <br />Components: Monitoring, Inspection, Onsite and Offsite Laboratory Testing, Report, Certification <br />Certifying Engineer/Principal Engineer hr.270.00$ 192 51,840$ <br />Project Manager/ Senior Engineer hr.224.00$ 768 172,032$ <br />CQA Monitor ( 4 required)hr.132.00$ 6656 878,592$ <br />AutoCAD hr.153.00$ 120 18,360$ <br />Travel and Per Diem (includes room, board, and vehicle)days 300$ 960 288,000$ <br />Offsite/Field Laboratory and Misc. Expenses months 6,500$ 8 52,000$ <br />Subtotal Final CQA Monitoring and Reporting 1,460,824$ <br />1E-3 Post Construction Aerial & Ground Survey <br />Components: Target setting, aerial photogrammetry survey, and ground survey. <br />Aerial Mapping ls 13,000$ 1 13,000$ <br />Subtotal, Post Construction Aerial Surveying 13,000$ <br />Subtotal, Final Cover 28,462,837$ <br />FINAL COVER (Cont.) <br />FOOTHILL SANITARY LANDFILL <br />Foothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsx Page 3 of 15