My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_JTD 9/3/2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_JTD 9/3/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 11:06:20 AM
Creation date
10/6/2025 9:32:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
JTD 9/3/2025
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Foothill Sanitary Landfill 27 Department of Public Works/Solid Waste <br />First Semiannual 2025 Groundwater Monitoring ©2025 County of San Joaquin. All rights reserved. <br /> <br />14.0 FACILITY MONITORING <br />County staff inspects the landfill and its associated facilities for any needed maintenance and <br />repair, to ensure that all facilities are functioning properly. The facility monitoring program for the <br />FSL includes regular maintenance, storm response, and site winterization. <br />14.1 Routine Maintenance <br />The County performs maintenance at the FSL, repairing minor damage, such as erosion rills <br />and ponding of water, on as needed basis. Maintenance monitoring is typically performed <br />monthly, unless there is a need for more frequent maintenance. Maintenance needs are typically <br />corrected immediately, but by no later than 30 days after monitoring is performed. <br />14.2 Storm Response <br />There was no need for storm response during the first semiannual 2025 period.
The URL can be used to link to this page
Your browser does not support the video tag.