Laserfiche WebLink
Total Landfill Surface 674.0 Acres <br />ET Closure Cap 1 7.5 Acres <br />Total Surface to Receive Liner 666.5 Acres <br />Surface lined as of July 2024 2 86.0 Acres <br />Surface to receive liner and ops layer in the future 580.5 Acres <br />Operations Layer Thickness 2.0 Ft <br />Future Operations Layer Volume 1.9 Million CY <br />Total Landfill Surface 674.0 Acres <br />Area presently closed 3 7.5 Acres <br />Remaining to be closed 666.5 Acres <br />Closure layer thickness 4 4.5 Ft <br />Future Closure layer volume 4.8 Million CY <br />Total Soil Requirements 6.7 Million CY <br />for future Operations Layer and Closure <br />Notes <br />1 It is assumed that the ET Closure cap of LF-1 will not receive liner <br />2 Includes Modules 2A and 2B <br />3 Top deck of Module "I" has been accepted as closed <br />4 Assumes evpotranspirative closure method <br />Operations Layer Soils <br />Closure Soils <br />Table 4 <br />Operations Layer and Closure Soil Volume Estimate <br />Foothill Sanitary Landfill <br />Foothill Sanitary Landfill <br />Joint Technical Document <br />San Joaquin County DPW - Solid Waste <br />July 2025