Laserfiche WebLink
COLOR: WHITE <br />SPECIFICATIONS <br />Table91Door <br />102Griddle 2 ft <br />Table3 <br />12 Three compartment sink4Vent Hood 10 ft <br />5 Stock pot 13 Handwash <br />14 Work table6Table <br />AA15 Window7Hot plate <br />r16 Hallway8Warmer <br />e <br />EQUIPMENT <br />60,000 BTU/H 0.65 GAL/H 5.2 GAL <br />9 <br />0.87 GAL/H 6.9 GAL80,000 BTU/H L <br />10.48 GAL120,000 BTU/H 1.31 GAL/H <br />7 <br />22.64 GAL260,000 BTU/H 2.83 GAL/HTOTAL <br />5 <br />3 <br />Legend 2 <br />fL Gas pipe V / <br />Connectors <br />I—S.E <br />DK TRAILERS <br />5 <br />I <br />[ <br />IK <br />TRAILERS'' <br />1 -2 FT GRIDDLE <br />MODEL DRGM24 <br />2-STOCK POT <br />MODEL DCSP1 <br />3- 4 BURNERS <br />MODEL DRHP 24 <br />CONSUMPTION <br />BTU/H <br />CONSUMPTION <br />GAL/H <br />I <br />F - T= <br />I <br />=4= <br />I <br />S.E <br />Salad prep table <br />11 Refrigerator <br />Double <br />contact <br />Stationary <br />Equipment <br />In an 8-hour workday, you will consume <br />22.64 gallons of LP gas with all equipment <br />running. <br />Considering that the cylinder has 100 gallons, <br />there will be 77.36 gallons available after <br />those 8 hours. <br />CONSUMPTION IN <br />8 HOURS <br />GAL <br />Mil <br />CUSTOMERzM EH AR ENTERPRISES LLC SIZE: 16' X 8' X 7 <br />COUNTY: <br />14 <br />x a o I