Laserfiche WebLink
U.S.Department of Homeland Security <br /> FEMA Region IX <br /> I I I I Broadway,Suite 1200 <br /> Oakland,CA.94607-4052 <br /> VEi 1H l.lJ. <br /> FEMA <br /> March 30, 2026 <br /> Jessica Leal, Project Planner <br /> San Joaquin Community Development Department <br /> 1810 E. Hazelton Avenue <br /> Stockton, California 95205 <br /> Dear Ms. Leal: <br /> This is in response to your request for comments regarding Application Referral Application <br /> Number PA 2500200 (C), (APN/Address: 069-020-19/20250 N. Staten Island Road, Thornton) <br /> (Supervisorial District 4). <br /> Please review the current effective Flood Insurance Rate Maps (FIRMS) for County of San <br /> Joaquin(Community Number 060299), Maps revised October 20, 2016. To locate FIRMS <br /> online, visit the Map Service Center(MSC) at https:Hmsc.fema.gov. Please note that San <br /> Joaquin County, California is a participant in the National Flood Insurance Program (NFIP). The <br /> minimum, basic NFIP floodplain management building requirements are described in Vol. 44 <br /> Code of Federal Regulations (44 CFR), Sections 59 through 65. <br /> A summary of these NFIP floodplain management building requirements are as follows: <br /> • All buildings constructed within a riverine floodplain, (i.e., Flood Zones A, AO, AH, AE, <br /> and Al through A30 as delineated on the FIRM), must be elevated so that the lowest <br /> floor is at or above the Base Flood Elevation level in accordance with the effective Flood <br /> Insurance Rate Map. <br /> • If the area of construction is located within a Regulatory Floodway as delineated on the <br /> FIRM, any development must not increase base flood elevation levels. The term <br /> development means any man-made change to improved or unimproved real estate, <br /> including but not limited to buildings, other structures, mining, dredging, filling, <br /> grading, paving, excavation or drilling operations, and storage of equipment or <br /> materials. A hydrologic and hydraulic analysis must be performed rlor to the start of <br /> development, and must demonstrate that the development would not cause any rise in <br /> base flood levels. No rise is permitted within regulatory floodways. <br /> w\vw.fema.gov <br />