My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025 Q3 CORRECTIVE ACTION
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
2023-2025 Reports
>
COMPLIANCE INFO_2025 Q3 CORRECTIVE ACTION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 2:24:42 PM
Creation date
10/30/2025 8:40:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025 Q3 CORRECTIVE ACTION
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Brendan Kenny <br />Central Valley Regional Water Quality Control Board <br />October 15, 2025 <br />www.arcadis.com <br />Forward Landfill 3Q25 CAP Update <br />4/4 <br /> Flare FL-150 had a total runtime of 727.5 hours and a total downtime of 16.5 hours in July 2025, a total <br />runtime of 699.42 hours and downtime of 44.6 hours in August 2025, and a total run of 720 hours and no <br />down time in September 2025. Flare Fl-150 recorded a maximum adjusted flow rate of 2,727 scfm. <br />Geosyntec’s Third Quarter 2025 Corrective Action Program Update concluded that the data collected by SCS <br />during the reporting period met the CAO requirements for the operation and maintenance of the landfill GCCS. <br />Closing <br />Arcadis will continue to monitor the Site’s GWTS, the residential GWTSs, and the facility’s landfill GCCS. Program <br />updates will be submitted to the Water Board by the required due dates. <br />If you have any questions or need additional information, please contact Dalia Rumani at 626-991-7597. <br /> <br />Sincerely, <br />Arcadis U.S., Inc. <br /> <br /> <br /> <br /> <br /> <br /> <br />Dalia Rumani, William Semel, PE <br />Project Manager Principal Engineer <br />California Professional Engineer #C-82542 <br /> <br /> <br /> <br />CC. Osvaldo Cordero, Forward, Inc. <br /> <br />Enclosures: <br />Attachment 1 Groundwater Treatment System Monitoring Logs <br />Attachment 2 Quarterly Correction Action Program Update – Landfill Gas Collection and Control <br />System
The URL can be used to link to this page
Your browser does not support the video tag.