My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HIGHWAY 33
>
35100
>
2900 - Site Mitigation Program
>
PR0506447
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2026 11:07:39 AM
Creation date
11/12/2025 11:04:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506447
PE
2960 - RWQCB LEAD AGENCY CLEAN UP SITE
FACILITY_ID
FA0007429
FACILITY_NAME
NUTRIEN VERNALIS FACILITY
STREET_NUMBER
35100
Direction
S
STREET_NAME
HIGHWAY 33
City
VERNALIS
Zip
95385
APN
25518008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
35100 S HIGHWAY 33 VERNALIS 95385
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bottom of the borehole to approximately 5 feet bgs.Sand will be placed in the remaining annulus <br /> to the ground surface and completed to match the surrounding surface conditions. <br /> 5.5 Monitoring Well Installation <br /> Monitoring wells will be installed using a hollow stem auger drilling rig. During drilling,soil cores <br /> will be collected using a split-spoon sampler every 5 feet and logged in accordance with the <br /> Unified Soil Classification System.The wells will be constructed of 2-inch diameter Schedule 40 <br /> polyvinyl chloride(PVC)rasing with 20 feet of 0.0104ch factory-slotted screen from 45 to 65 feet <br /> bgs. The annular space between the borehole walls and well screens will be backfilled with a <br /> silice sand filter pack to approximately 2 feet above the top of the well screen.A 2-toot bentonite <br /> transition seal will be installed above the filter pack and hydrated in place.A neat cement sanitary <br /> seal volt be installed from the top of the bentonite seal to just below the ground surface. <br /> Wells MW-5R and MW-8R will be completed with a flush mount traffic-rated well box. The <br /> remaining wells will be completed in an above-ground monument set in a concrete pad. The <br /> proposed monitoring well construction details are shown on Figure 9. <br /> 5.6 Well Development <br /> In accordance with California Well Standards(Department of Water Resources Bulletin 74),the <br /> wells will he developed s minimum of 48 hours after installation by a combination of bailing, FIGURES <br /> surging, and pumping. The total well depth, depth to groundwater, temperature, pH, specific <br /> conductivity, dissolved oxygen, and oxidation-reduction potential volt be measured prior to the MONITORING WELL NETWORK REPLACEMENT WORK PLAN <br /> start and periodically during development. Development will continue until a minimum of five Nutrien Ag Solutions, Ina <br /> casing volumes of water have been removed and water quality parameters have stabilized. Vernalis, California <br /> 5.7 Well Survey <br /> May 2020 <br /> The location, ground surface elevation, and top of casing elevation will be measured by a <br /> California-licensed Professional Land Surveyor in accordance with the requirements forthe State <br /> Water Resources Control Board Geotrecker database. <br /> 5.9 Decontamination and Waste Management <br /> Down-hole drilling equipment will be decontaminated prior to drilling each well using high- <br /> pressure cleaning equipment. The decontamination rinsate, well development water, and soil ^� <br /> cuttings generated during drilling will be placed into separate roll-off boxes or 55-gallon drums <br /> and labeled,dated,and staged on site prior to characterization and disposal at an appropriate off- <br /> sitefacility. <br /> 5.9 Scheduling and Reporting <br /> Feld activities will be initiated after receiving the RWQCB's authorization to proceed and obtaining <br /> well drilling and encroachment permits.A Monitoring Well Network Replacement Report will be <br /> submitted approximately 8 weeks after completing the field activities.At a minimum,the report <br /> will contain: <br /> Nuelen Vemalia,Czlircmla 3 <br /> Monitoring Well Netvm Replacement Work Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.