My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2500930
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LANDING
>
3005
>
2600 - Land Use Program
>
SU-2500930
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2025 2:21:22 PM
Creation date
12/1/2025 8:15:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU-2500930
PE
2600 - LAND USE PROGRAM
STREET_NUMBER
3005
Direction
E
STREET_NAME
LANDING
STREET_TYPE
LN
City
STOCKTON
Zip
95206
APN
17726040
CURRENT_STATUS
Closed - Issued
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
3005 E LANDING LN STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAUTION: IF THIS SHEET IS NOT 30"x42" IT IS A REDUCED PRINT <br /> PRE-CONSTRUCTION NOTES RESPONSIBILITY MATRIX SHEET INDEX <br /> o00 <br /> 00N <br /> � � <br /> 00 <br /> ABBREVIATIONS LEGEND: SHEET ISSUED ON DATE INDICATED, WITH MODIFICATIONS ISSUANCE Q <br /> 1. PRIOR TO START OF CONSTRUCTION, A PRE-CONSTRUCTION MEETING IS TO BE z ci) z <br /> LO <br /> HELD INCLUDING A RESPONSIBLE REPRESENTATIVE OF THE ARCHITECT,THEQ o N <br /> REQ'D (REQUIRED): NEEDED FOR THE PROJECT � WM: WARE MALCOMB � TT: TENANT � LL: OWNER/LANDLORD � GC: GENERAL CONTRACTOR o <br /> OWNER AND THE GENERAL CONTRACTOR. THE DISCUSSION WILL BE IN REGARDS SHEET ISSUED ON DATE INDICATED, NO MODIFICATIONS 0 N ,1 00 o J a <br /> TO THE ARCHITECT-OWNER-CONTRACTOR (AOC) CORRESPONDENCE PROCESSES 0 <br /> REQ'D CONTRACTED BY <br /> AND PROCEDURES. AT A MINIMUM, THE FOLLOWING IS TO BE DISCUSSED: Nz c <br /> ARCHITECTURE, ENGINEERING, DESIGN COMMENTS <br /> o <br /> 2. AOC REGULARLY SCHEDULED MEETINGS Y N WM GC TT LL oLL 00 <br /> X ARCHITECTURE-OFFICE CONTAINER X ARCHITECTURAL r N M w Q) <br /> 2.1. WHEN : a <br /> 2.2. WHERE X ARCHITECTURE- RESTROOM TRAILERS(INCL. ADA) X G010 TITLE SHEET <br /> 000o <br /> 2.3. HOW OFTEN 1100 SITE PLAN (TEMPORARY USE PERMIT) 0000 <br /> CJ LOGISTICS <br /> 2.4. IN PERSON VERSUS CONFERENCE CALLS X STRUCTURAL ENGINEERING X I 1 01 ENLARGED SITE PLAN (TEMPORARY USE PERMIT) 0000 LL <br /> = <br /> 2.5. APPROXIMATE ALLOTTED TIME PER MEETING 1102 ENLARGED SITE PLAN (TEMPORARY USE PERMIT) 0000 0 <br /> X 3RD PARTY INSPECTION <br /> 3. CONSTRUCTION MEETING MINUTES ARCHITECTURAL SHEET COUNT:4 <br /> X MECHANICAL ENGINEERING X m <br /> 0 <br /> 3.1. FORMAT FOR THE MINUTES X PLUMBING ENGINEERING X 3005 E . LANDING LN . m z <br /> 3.2. CONTRACTOR TO AUTHOR THE MINUTES w <br /> m � <br /> 4. FORMAL CHANGES IN THE WORK X ELECTRICAL ENGINEERING X 0 z <br /> X CIVIL ENGINEERING ELECTRICAL Q w w <br /> 4.1. ADDENDA AND BULLETINS ISSUED BY THE ARCHITECT E0.00 ELECTRICAL LEGEND,ABBREVIATIONS, INDEX :7z w <br /> 4.2. CHANGE ORDER REQUESTS ISSUED BY THE CONTRACTOR X LANDSCAPE ARCHITECT AND DESIGN X STOCKTON , CALIFORNIA 95206 ES1.00 OVERALL ELECTRICAL SITE PLAN � z z z <br /> 4.3. CHANGE ORDERS ISSUED BY THE CONTRACTOR Q <br /> 4.4. TRACKING MECHANISMSX LIGHTING DESIGNER <br /> ES1.11 ENLARGED NORTH TRAILER PLAN w Z o <br /> 5. REQUESTS FOR INFORMATION PROCESS X ENVIRONMENTAL GRAPHICS TEMP R A R Y E PERMIT B M I TTA L E5 112 EXISTING MSBUSINGLE ENLARGED SOTHTRA1 LINE DIAGRAM PLAN LL <br /> 0 m m <br /> O 0 <br /> 5.1. TRACKING MECHANISM X FIRE SPRINKLER X E5.14 EXISTING MSE SINGLE LINE DIAGRAM o cc <br /> 5.2. DEFINE Cc: RECIPIENT LIST <br /> ELECTRICAL SHEET COUNT:6 z D <br /> 5.3. STANDARD RESPONSE TIMES(2-5 WORKING DAYS IS STANDARD) X FIRE ALARM X = W z o <br /> 6. SUBMITTAL PROCESS X INFORMATION TECHNOLOGY DESIGN X 0 a <br /> w <br /> J Z <br /> a a - <br /> 6.1. TRACKING MECHANISM X STRUCTURED CABLING CONSULTANT X <br /> 6.2. ISSUANCE SCHEDULE BY THE CONTRACTOR X AUDIO/VISUAL CONSULTANT o <br /> 6.3. DEFINE Cc RECIPIENT LIST m <br /> 6.4. STAMPED REVIEWED AND APPROVED BY CONTRACTOR PRIOR TO X SECURITY DESIGN X <br /> SUBMISSION PROJECT DESCRIPTION & SCOPE w <br /> 6.5. NON REQUESTED SUBMITTALS MAY NOT BE REVIEWED X COMMISSIONING AGENT(MEP SYSTEM) m AI ' <br /> 6.6. STANDARD RESPONSE TIMES(7-10 WORKING DAYS IS STANDARD) Q <br /> X ENVIRONMENTAL/ASBESTOS CONSULTANT <br /> 7. SUBSTITUTIONS ,.i <br /> X HAZARDOUS MATERIALS CONSULTANT ` <br /> 7.1. REQUEST FORMS WITH REASONS AND BENEFIT FOR SUBSTITUTION PROJECT DESCRIPTION: THE PROPOSED SCOPE OF WORK INCLUDES THE INSTALLATION OF FIVE (5) PRE-FABRICATED,TEMPORARY OFFICE < <br /> X ACOUSTICAL ENGINEER/DESIGNER CONTAINERS TO SERVE AS INTERIM OFFICE SPACE FOR STAFF UNTIL COMPLETION OF THE PERMANENT TENANT m <br /> LL <br /> 8. PAYMENT APPLICATIONS IMPROVEMENT PROJECT. IN ADDITION, THE SCOPE INCLUDES THE PROVISION OF ONE (1) TEMPORARY RESTROOM 2025 <br /> X LEED OR WELL DESIGN AND ADMINISTRATIONS FACILITY,WHICH WILL INCORPORATE A FULLY COMPLIANT ADA-ACCESSIBLE RESTROOM TO ENSURE ACCESSIBILITY <br /> 8.1. PROCESS X [SPECIALTY CONSULTANT] REQUIREMENTS ARE MET DURING THE INTERIM OCCUPANCY. N p F �Q- <br /> 8.2. SUBMITTAL DATE <br /> 8.3. ANTICIPATED TURN-AROUND Q <br /> w <br /> 9. PUNCH LISTS <br /> OCC. CLASSIFICATION: B- BUSINESS <br /> 9.1. ONLY ONE PUNCH WALK TO BE PROVIDED BY DESIGN TEAM REQ'D CONTR'D BY SCOPE AREA(S): EACH CONTAINER 300 S.F. mo <br /> 9.2. CONTRACTOR TO PUNCH AND MAKE CORRECTIONS OR CREATE A MINIMAL LIST VENDORS / INSTALLERS COMMENTS / CONTACTS X5 CONTAINERS 1500 S.F. LL <br /> OF CORRECTIONS PRIOR TO DESIGN TEAM PUNCH. <br /> Y N GC TT LL (TEMPORARY OFFICES) TOTAL 1500 S.F. <br /> 9.3. A FINAL WALK WILL OCCUR ONLY IF THE ARCHITECT IS CONTRACTED TO DO S0. X FURNITURE X z <br /> o <br /> X OFFICE FRONTS(GLAZING SYSTEMS) CHANGE IN USE: ❑YES ONO 0 <br /> G.C. INSTRUCTIONS X I.T. SYSTEMS X > CATELLUS <br /> X I.T.CABLING X w <br /> m <br /> SUBMITTALS X AUDIO/VISUAL EQUIPMENT Q <br /> 1. AT THE START OF JOB PROVIDE A SCHEDULE OF ALL ANTICIPATED SUBMITTALS AND DATES. X SECURITY DESIGN/INSTALL X <br /> FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG SUBMITTALS THAT WILL BE BUILDING & CODE INFORMATION <br /> REQUESTED TO BE EXPEDITED FASTER THAN THE STANDARD 7-10 DAYS. X INTERIOR SIGNAGE(NON-CODE) X Q <br /> 2. A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A CURRENT COPY IS X INTERIOR GRAPHICS X 0 <br /> TO BE INCLUDED WITH EACH SUBMISSION. X SOUND MASKING BUILDING DEPARTMENT: CITY OF STOCKTON, CALIFORNIA z <br /> w <br /> 3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND SIGNATURE BY THE APPLICABLE BUILDING 2022 CALIFORNIA BUILDING CODE o <br /> GENERAL CONTRACTOR PRIOR TO SUBMISSION.THE REVIEW WILL INCLUDE BUT NOT BE LIMITED X HIGH PILE STORAGE 2022 CALIFORNIA MECHANICAL CODE <br /> CODES: 2022 CALIFORNIA ELECTRICAL CODE <br /> TO: X SPECIALTY EQUIPMENT/MOVING/INSTALL X <br /> 2022 CALIFORNIA PLUMBING CODE Q <br /> 3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE CONTRACT X ARTWORK 2022 CALIFORNIA FIRE CODE (WITH LOCAL AMENDMENTS) 0n <br /> DOCUMENTS. 2022 CALIFORNIA ENERGY CODE m <br /> 3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES 2022 CALIFORNIA GREEN BUILDING STANDARDS CODE > <br /> 3.3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE 2022 CALIFORNIA BUILDING CODE -ACCESSIBILITY 0 J <br /> 3.4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNIBLE THROUGH Q <br /> MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE CONTRACT EXISTING BUILDING IIB CBC 602 w <br /> DOCUMENTS WILL NOT BE PROVIDED. CONSTRUCTION TYPE: <br /> 3.5. SUBMITTALS SHALL BE IN ELECTRONIC FORMAT UNLESS PHYSICAL SAMPLES ARE <br /> REQUESTED. NUMBER OF STORIES: LL <br /> 1 <br /> 4. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT BE REVIEWED OCCUPANCY CLASS: B CBC CHAPTER 3 Q m <br /> AT THE DESIGN TEAM'S DISCRETION. 1 <br /> SEPARATIONS: ❑YES N NO CBC TABLE 508.4 <br /> 5. SUBMITTALS ARE TO BE ROUTED THROUGH THE ARCHITECT AND ARE NOT TO BE SENT DIRECTLY Q <br /> TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED BY THE ARCHITECT. FIRE SPRINKLERS: ❑YES NNO z <br /> 6. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S REVIEW. IF A FIRE ALARM: ❑YES N NO 0 - <br /> CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR SCHEDULE,THE <br /> CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW AND APPROVAL BY THE ACCESSOR'S PARCEL #: 177-260-40 AND 177-260-41 Lj_j11 z O <br /> OWNER AND ARCHITECT PRIOR TO PROCEEDING. It <br /> LEGAL DESCRIPTION: N/A LJJ J LL <br /> REQUESTS FOR INFORMATION (RFI's) BLOCK/LOT: N/A z <br /> ('� J <br /> 1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE BFI's AND MAKE EVERY EFFORT TO w <br /> ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM. � �^ <br /> m v, <br /> o <br /> 2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S REVIEW. IF A <br /> CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR SCHEDULE,THE 0 <br /> CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW AND APPROVAL BY THE < Z Z Q <br /> w <br /> OWNER AND ARCHITECT PRIOR TO PROCEEDING. 0 <br /> O <br /> PROJECT DIRECTORY RELATED SUBMITTALS <br /> 3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A CURRENT COPY IS TO BE Q J <br /> INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY CRITICAL RESPONSE DUE DATES. 0 <br /> 4 BE REMOVEDNG FROM THEDS AND RFIRFI LOG. ARCHITECT <br /> OF CONSTRUCTION WILL NOT BE REVIEWED AND WILL ARCHITECT BUILDING OWNER COM-BP-2503185: PERMIT TO INSTALL TEMPORARY DUST-CONTROL WALL IN BUILDING DURING DEMOLITION &CONSTRUCTION. w 0 L1J U <br /> CHANGE ORDERS � 0 <br /> CATELLUS BLDG DEMO BP2502684: PERMIT TO DEMOLISH EXISTING MEZZANINE STRUCTURE WITHIN BUILDING. LL O 0 <br /> LL <br /> 1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED TO THE OWNER WAREJcOMB STOCKTON VERTICAL I, LP PRIMARY CONTACT: BILL KENNEDY COM BP2502654 TENANT IMPROVEMENT PERMIT Q W O <br /> AND ARCHITECT PRIOR TO THE START OF ANY WORK. 66 FRANKLIN STREET, SUITE 200 PH: (510)267-3420 U con <br /> 4683 CHABOT DR. #300 PRIMARY CONTACT: ROB BURKHART ASSOC.AIA OAKLAND, CALIFORNIA 94607 EMAIL: bkennedy@catellus.com -J <br /> 2. ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE OWNER AND PLEASANTON, CALIFORNIA 94588 PH: (602)904-1315 PH: (510)267-3400 <br /> ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER. LL <br /> w <br /> PH: (925) 244-9620 EMAIL: rburkhart@waremalcomb.com u <br /> x <br /> 3. CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE ALONG WITH PH: (925) 244-9621 <br /> TRADE BACK-UP AND UNIT PRICING WHERE APPLICABLE. <br /> m <br /> 4. A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY THE GENERAL <br /> CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER REQUEST. ARCHITECT'S CONSULTANTS TENANT LL <br /> = <br /> PROJECT SCHEDULE o <br /> 1. A COMPLETE CONSTRUCTION SCHEDULE OF ALL PORTIONS OF THE WORK TO BE PROVIDED TO ELECTRICAL ENGINEER TENANT Q <br /> THE OWNER AND ARCHITECT PRIOR TO START OF ANY WORK. IMEG PRIMARY CONTACT: ROBERT CLARKE CJ LOGISTICS AMERICA PRIMARY CONTACT: RYAN MATURO z <br /> 2. THE SCHEDULE SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT DOCUMENTS. 820 W. CHARLESTON BLVD., SUITE 3 PH: (702)769-1465 1750 S.WOLF ROAD PH: (331)333-2476 0 <br /> LAS VEGAS, NEVADA 89117 EMAIL: rclarke@gacengineers.com DES PLAINES, ILLINOIS 60018 EMAIL: ryan.maturo@cjlogisticsamerica.com <br /> 3. THE SCHEDULE SHALL BE REVISED AT APPROPRIATE INTERVALS AS REQUIRED BY THE PH: (331)333-2476 N <br /> CONDITIONS OF THE WORK AND PROJECT AND THE CONTRACTOR SHALL NOTIFY THE OWNER DEFERRED SUBMITTALS <br /> LL <br /> cc <br /> AND ARCHITECT IF FOR ANY REASON THE SCHEDULE IS EXTENDED. 0 <br /> o w <br /> 4. A THREE WEEK LOOK-AHEAD SHALL BE REVIEWED REGULARLY AT EACH AOC MEETING WHICH z cc <br /> WILL BE IN-LINE WITH THE OVERALL CONSTRUCTION SCHEDULE. TENANT (CONSTRUCTION MANAGER) Q Lj <br /> CJ LOGISTICS AMERICA PRIMARY CONTACT: T.B.D. DEFERRED SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE ARCHITECT AND ENGINEERS OF -L LL.I <br /> RECORD WHO SHALL REVIEW AND PROVIDE NOTATION INDICATING DOCUMENTS HAVE BEEN <br /> 1750 S.WOLF ROAD PH: T.B.D. REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE WITH THE BUILDING DESIGN. Q <br /> LOCATIONMAP DES PLAINES, ILLINOIS 60018 EMAIL: T.B.D. SUBMITTAL MATERIALS SHALL INCLUDE PLANS, DETAILS AND CALCULATIONS PREPARED AND <br /> PH: (331)333-2476 SIGNED BY A STATE REGISTERED ENGINEER. m LL.I <br /> CONTRACTOR SHALL SUBMIT ARCHITECT AND ENGINEER REVIEWED SUBMITTAL MATERIALS TO 0 J <br /> THE BUILDING OFFICIAL FOR REVIEW AND PERMIT APPROVAL. DEFERRED SUBMITTAL ITEMS <br /> SHALL NOT BE INSTALLED PRIOR TO OBTAINING THE BUILDING OFFICIAL'S APPROVAL OF THE <br /> SUBMITTAL. LL <br /> m <br /> GENERAL CONTRACTOR 1. AUTOMATIC FIRE SPRINKLER SYSTEM. <br /> 2. FIRE ALARM SYSTEM. <br /> 3. EXTERIOR BUILDING SIGNAGE UNDER SEPARATE PERMIT. 0 <br /> COMPANY NAME <br /> BIG D PACIFIC BUILDERS PRIMARY CONTACT: DAVE SCHUE <br /> PH: (925)460-3733 <br /> EMAIL: dscheu@big-d.com w <br /> Q <br /> ARCH AIRPORT RD. LL <br /> Q p <br /> o <br /> m <br /> J OWNER'S CONSULTANTS <br /> w <br /> W <br /> U 0 <br /> Y CIVIL ENGINEERCAR = <br /> 2633 CA INO RA &GIBBON, INC PRIMARY CONTACT: RYAN HANSEN CONTRACT DOCUMENT R E V I E WLL <br /> 2633 CAMINO RAMON#350 PH: (925)322-7984 Q <br /> SAN RAMON, CALIFORNIA 94583 EMAIL: rhansen@cbandg.comCL <br /> z PA/PM: R. BURKHART <br /> 99 THE UNDERSIGNED ACKNOWLEDGE THAT THESE CONTRACT DOCUMENTS REPRESENT THE FINAL PHASE OF THE DESIGN DOCUMENT DEVELOPMENT PROCESS DRAWN BY.: E.S. <br /> Q92� BY WARE MALCOMB AND ITS DESIGN CONSULTANTS AND ANY REQUESTED REVISIONS MAY CAUSE AN ADJUSTMENT IN THE ARCHITECTURAL CONTRACT SUM. <br /> s yN PROPOSED ADJUSTMENTS TO THE CONTRACT SUM SHALL BE SUBMITTED AND ACCEPTED PRIOR TO THE START OF ADDITIONAL WORK. L JOB NO.: SNR25-0011-00 <br /> LL <br /> <�Z� suNNY RD. GEOTECHNICAL ENGINEER <br /> U <br /> NAME: SIGNATURE: DATE: <br /> ENGEO PRIMARY CONTACT: ZAC CRAWFORD SHEET Q <br /> 9 2010 CROW CANYON PLACE, SUITE 250 PH: (925)279-2698 LamLO <br /> ., <br /> z N SAN RAMON, CALIFORNIA 94583 EMAIL: zcrawford@engeo.com NAME: SIGNATURE: DATE: z o <br /> \.PNS\NG\'P QG010 LO <br /> N PROJECT SITE E NAME: SIGNATURE: DATE: o N <br /> a W <br /> NOT TO SCALE w o <br /> _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.