Laserfiche WebLink
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 9. COMMENTS <br /> CS1=Containment Solutions, Inc. APT=Advanced Polymer Technology. PS=Piping Sump. <br /> Total Cont=Total Containment. <br /> *Note: Unable to maintain a stable pressure on all Secondary Piping due to the test seal off boots <br /> and crossover tubing. We found multible test boots and crossover tubes split or borken off inside <br /> both the Turbine Piping Sumps and all four UDC's. I Recommend all 16 test seal off boots and all <br /> crossover tubes be replaced to obtain proper seal off for testing. I recommend no hydorstatic <br /> testing of the Turbine Piping Sumps or UDC's until proper seal off the Secondary Piping can be <br /> maintained. <br /> Note: I did not attempt to perform hydrostatic testing of the Turbine Piping Sumps or UDC's at this <br /> testing event, due to the condition of the test seal off boots. <br /> All tests marked "Fail"and any repairs made before or during the tightness test must be described in <br /> the COMMENTS section. <br /> Page 5 of 5 <br />