Laserfiche WebLink
I "I INS J C O G, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0574•Email: boyd@sjcog.org <br /> San Joaquin County Multi-Species Habitat Conservation &Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION(RTLJ) <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Jacob Pahule,San Joaquin County,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. Phone: (209)235-0574 Email: boyd@sjcog.org <br /> Date: December 9, 2025 <br /> Local Jurisdiction Project Title: PA-2500251 (MS) <br /> Assessor Parcel Number(s): 086-400-26 <br /> Local Jurisdiction Project Number: PA-2500251 (MS) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to be Disturbed: Urban and Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. <br /> Dear Mr. Pahule: <br /> SJCOG, Inc. has reviewed the project referral for PA-2500251 (MS). This project consists of a Minor Subdivision application to <br /> create four lots and a Designated Remainder. Lot 1 will contain 2.0 acres,Lot 2 will contain 2.01 acres,Lot 3 will contain 2.33 acres,Lot 4 <br /> will contain 2.0 acres and the Designated Remainder will contain 2.0 acres. The lots will be served by onsite well and septic systems, <br /> with natural drainage. Lots 1 and the Designated Remainder will have direct access from East Foppiano Lane, a County-maintained <br /> road. Lots 2, 3, and 4 will be accessed through a proposed private access easement. The project site is on the north side of East <br /> Foppiano Lane, 1,800 west of North Solari Ranch Road,Stockton(APN/Address: 086400-26/6197 East Foppiano Lane,Stockton). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> At this time, the applicant is requesting a Minor Subdivision with no ground disturbance. Any future <br /> ground disturbing activities (e.g. roads, curb, gutter, electrical, water, etc.) or any physical structures <br /> that require ground disturbance on this or subsequent divided parcels will be subject to participate in <br /> the SJMSCP before ANY ground disturbance occurs and should be resubmitted to this agency. <br /> Current or future owners of this-or subdivided properties should be made aware of the conditions that <br /> are placed by the SJMSCP on future development on the created parcels. <br /> This Project is subject to the SJMSCP. This can be up to a 30 day process and it is recommended that the project <br /> applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant obtain an <br /> information package. http://www.sicoci.org <br /> Please contact SJMSCP staff regarding completing the following steps to satisfy SJMSCP requirements: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to anyground disturbance <br /> • SJMSCP Incidental take Minimization Measures and mitigation requirement: <br /> 1. Incidental Take Minimization Measures(ITMMs)will be issued to the project and must be signed by the project applicant prior to any <br /> ground disturbance but no later than six(6)mouths from receipt of the ITMMs. If ITMMs are not signed within six months,the applicant <br />