Laserfiche WebLink
-$wow*— i�2�of <br />LEGEND <br />1. Steps—3 Treads %$ Risers .._�� <br />15' <br />Relief Valve: <br />2. Main Outlet: Size---.-- <br />16. <br />Overflow Skimmer- 1 <br />3. Returns 3 Size <br />17. <br />Separation Tank <br />Q ..... <br />lab Size 1 <br />4. Fitter Location—Slab <br />18. <br />Ladder 13 TY -Re <br />5. Pump 81 Motor Eel_ pt <br />19, <br />Diving Board Support <br />6. Filter Type <br />20. <br />Diving Board $ <br />7. Life Line Anchors '"" <br />I " I N <br />21. <br />22. <br />Vacuum Cleaner <br />Heater 4AA&I _BTU A;X- <br />8. Coping Stone <br />9. TileI Color S01 <br />23. <br />Gas. Line � _Run / 4�Q Size <br />_Row <br />10. Light Niche For___�Z_._._Wutt Light <br />24. <br />Lights _._ .2sa._ Size-wTAP_=--Wiring. <br />11. Light Junction Box ti E< -- <br />25. <br />Light Switch <br />12. Conduit 5 f <br />26. <br />Life Line <br />13. White Plaster Interior Finish <br />27, <br />Other: <br />1 <br />14. Fil{spout: Type Nl'1 Size <br />MECHANICAL AND CONSTRUCTION DATA <br />A. Electrical Work By: Switching Sk Wiring By: "amu«.f g4#' Co <br />Distance to Motor__ Horse Power Volts 2u Phase_.... 60 Cycles <br />B. Backwash: Stu,—Ft. SixeL4_To By C'K` O <br />C. Pool -Volume: Gallons. �ttI� <br />D. Piping: Main Drain Overflow......._ Return _L Other <br />E. Access Deck Elevation <br />F. Type <br />Soil QA <br />G. Earth Disposal <br />H. Site Preparation _--tQ QAj .- - _— <br />I . Other <br />STEEL SCHEDULE . <br />Bond Beam- 3 #40 Bars Continuous <br />Walls 8 Floor= 3 0 Bars 12" O.C.S.W. <br />Throughout. <br />3 0 Bars 12" O.C. From <br />break in deep end. <br />NOTE <br />Fresh water to pool, electrical connections, <br />bonding and waste disposal shall be in ac- <br />cordance with local building codes. <br />