Laserfiche WebLink
CALIFORNIA TANK LINES, INC.WASHRACK MAINTENANCE LOG MONTH OF _______________ <br />DAILY 12345678910111213141516171819202122232425262728293031 <br />Check pumps for proper operation <br />Check caustic and acid tanks <br />Check Spill Prevention Box and <br />wiring <br />Check storage tanks and all piping <br />for leaks <br />Clean PH probes <br />Check Safety Gear <br />Clean & Check all Eye Wash and <br />Safety Showers <br />Cleaned Containment Area <br />WEEKLY <br />Clean solids from PH adjusting <br />tank <br />MONTHLY <br />Clean & Calibrate PH probes - <br />Monday to Friday <br />REPAIRS <br />COMMENTS <br />METHOD OF CALIBRATING <br />STEP I - Begin with PH7 solution, let probe remain in solution for approximately 15 minutes, or until a stable reading is obtained. <br />STEP II - Same as above with PH4 solution. <br />STEP III - Same as above with PH10 solution. <br /> SIGN & DATE __________________________________________________ <br />Cal. Washrack Maintenance Log -WRLOGSH