My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2025
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LONGE
>
7910
>
2231-2238 – Tiered Permitting Program
>
PR0536175
>
COMPLIANCE INFO_2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2025 4:21:59 PM
Creation date
12/18/2025 4:15:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2025
RECORD_ID
PR0536175
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0012466
FACILITY_NAME
PREMIER FINISHING
STREET_NUMBER
7910
Direction
S
STREET_NAME
LONGE
City
STOCKTON
Zip
95206
APN
17726034
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
7910 S LONGE STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tiered Permitting Program Inspection Report <br />Date: <br />July 30, 2025 <br />Facility Address: <br />7910 S LONGE, STOCKTONPREMIER FINISHING <br />Facility Name: <br />Environmental Health Department <br />Item # Remarks <br />Inspector Phone: <br />(209) 616-3067 <br />Inspector: <br />Lynsey Sammons, REHS <br />Date:July 30, 2025 <br />Printed Name and Title: <br />(PDLOHGWRNorman Lumpkin, Environmental Contact <br />QOXPSNLQ#EFSDLQWLQJVROXWLRQVFRP <br />Received by: <br />AFTER THE COMPLIANCE DATE, EHD WILL BILL FOR ALL TIME AND ACTIVITIES ASSOCIATED WITH BRINGING THIS <br />FACILITY BACK INTO COMPLIANCE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Overall Inspection Comments <br />The inspection is incomplete. A walk-through of the facility was conducted 7/30/25. The paperwork inspection is <br />scheduled for August 7, 2025. <br />An inspection checklist was provided to the facility operator at the time of inspection. The inspector will provide a <br />complete report to the facility operator within the next few weeks. <br />Complete and submit a copy of the Return to Compliance Certification form to the EHD with a statement <br />documenting the corrective actions that have been or will be taken for each violation, and any supporting paperwork, <br />within 30 days of receiving the complete inspection report. <br />1868 E. Hazelton Avenue | Stockton, California 95205 | T 209 468-3420 | F 209 464-0138 | www.sjgov.org/EHD <br />Page 3 of 3EHD - CUPA Inspection Report IS02 7/30/2025FA0012466 PR0536175 4530608
The URL can be used to link to this page
Your browser does not support the video tag.