My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:02:45 PM
Creation date
1/2/2026 4:59:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231211
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6425 N PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN aOAQUIN AMENDED Environmental Health Department <br /> —COUNTY— 1�12�2026 <br /> „realness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> SAFEWAY FUEL CENTER#2707 16425 N PACIFIC AVE STOCKTON JanuarV 12 2026 <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I, CLASS II, or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 4 23 CCR 16 2613(a)(4) and (b), 2650(a), (c), and (e) 2011012 - Facility has submitted and maintains a monitoring site <br /> plan <br /> OBSERVATION: An accurate UST Monitoring Site Plan was not submitted. <br /> -The UST Monitoring Site Plan is not to scale. <br /> REGULATION GUIDANCE: 2650 (c) Owners or operators must submit a monitoring site plan for approval by the Unified <br /> Program Agency. The monitoring site plan must include, but is not limited to, the following: (1) a scaled diagram <br /> indicating the layout of the tank(s) and piping to the extent known, including containment sumps. (2) locations of all <br /> release detection equipment; and (3) if applicable, each vacuum, pressure, or hydrostatic interstitial monitoring zone. <br /> CORRECTIVE ACTION: Corrected on-site. Facility submitted UST Monitoring Site Plan drawn to scale. <br /> This is a (Minor)Violation. <br /> 6 23 CCR 16 2613(a)(7), 2690(a)(5); HSC 6.7 25292.2 2011008 -Submitted/maintained current Cert of Financial <br /> Responsibility/mech of financial assurance (TCR 11) <br /> OBSERVATION: Owner/Operator failed to maintain current copy of the Certification of Financial Responsibility on-site. <br /> REGULATION GUIDANCE: A copy of current financial responsibility documents are required to be maintained on site. <br /> CORRECTIVE ACTION: Corrected on-site. Facility printed current copy of Certification of Financial Responsibility during <br /> inspection. <br /> This is a (Minor)Violation. <br /> 7 23 CCR 16 2613(a)(8) and (b), 2630(b) 2011004-Owner/Operator submitted DO form within 30 days of UST install or <br /> DO change (TCR 10) <br /> OBSERVATION: The name of the DO Fernando Solis Sierra is not identical to that individual's name as listed on the <br /> individual's International Code Council UST System Operator certificate. <br /> REGULATION GUIDANCE: 2630(b)Within 30 days of installing an underground storage tank system or any change to <br /> the designated underground storage tank operator(s), the owner or operator must submit to the Unified Program Agency <br /> information identifying the designated underground storage tank operator(s)for the facility. The name of each designated <br /> underground storage tank operator listed in the California Environmental Reporting System must be identical to that <br /> individual's name as listed on the individual's International Code Council UST System Operator certificate. <br /> CORRECTIVE ACTION: Submit a current Designated Underground Storage Tank Operator Identification Form. <br /> This is a (Minor)Violation. <br /> 40 23 CCR 16 2613(e) 2011002 - Installation, repair, lining, integrity, calibration, and release records maintained for life of <br /> UST <br /> OBSERVATION: Records of installation, repairs, linings, integrity certification, tank calibration charts, and/or <br /> unauthorized release reports were not kept onsite, or offsite if approved by the UPA, for the life of the UST. <br /> -The following were not available for review at the time of inspection: installation test results, manufacturer checklists <br /> and as built drawings. <br /> REGULATION GUIDANCE: (e) The following records must be maintained by the owner or operator on site, or off site at <br /> a readily accessible location if approved by the Unified Program Agency, for the life of the underground storage tank <br /> system: (1) Installation records including, but not limited to: (A) Installation test results; (B) Manufacturer checklists and <br /> manuals; and (C)As-built drawings. <br /> CORRECTIVE ACTION: Immediately locate and maintain these records onsite and submit copies to the UPA within 30 <br /> days. <br /> This is a (Minor)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 4 of 5 FA0002409 PR0231211 4598445 1/12/2026 <br /> CP26-U aST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />
The URL can be used to link to this page
Your browser does not support the video tag.