My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:02:45 PM
Creation date
1/2/2026 4:59:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231211
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6425 N PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Overfill Prevention Equipment Testing Report Form <br /> 6. OVERFILL PREVENTION EQUIPMENT DETAILS <br /> Test Method Developed by ✓❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> ❑Check this box if Appendix 7.1 continuation page is attached. <br /> Tank ID (one OPE per column) Tank 1 : Regular Tank 2: Premium Tank 3 : Diesel <br /> Tank Manufacturer Modern Welding Modern Welding Modern Welding <br /> Tank Capacity (Gallons) 20073 10050 10050 <br /> Tank Inside Diameter (Inches) 119.75 119.250 119.250 <br /> Are both vent and tank riser piping El Yes ❑ Yes ❑ Yes El Yes <br /> secondarily contained? ❑✓ No ❑✓ No ❑✓ No ❑ No <br /> OPE Manufacturer/ Model Emco A1100 Emco A1100 Emco A1100 <br /> What is the OPE response when activated? ✓❑Shut off ✓❑Shut off ❑✓ Shut off ❑Shut off <br /> (Check all that apply.) <br /> El Restrict El Restrict El Restrict El Restrict <br /> ❑Audible ❑Audible ❑ Audible ❑Audible <br /> ❑Visual ❑Visual ❑ Visual ❑Visual <br /> Are flow restrictors installed on vent piping ❑Yes* ❑Yes* ❑ Yes* ❑Yes* <br /> that may interfere with the OPE operation? ✓❑No ✓❑ No ❑✓ No ❑ No <br /> For audible/visual overfill alarms, are they ❑Yes El Yes ❑Yes ❑Yes <br /> clearly audible/visible at the tank fill point? ❑No ❑ No ❑No ❑ No <br /> At what level in the tank does the OPE <br /> 103.125 102.750 103 <br /> activate? (Inches from bottom of tank) <br /> What is the percent capacity of the tank at <br /> 91.7% 91.6% 91.8% <br /> which the OPE activates? <br /> Is the OPE in proper operating condition to ✓❑Yes ✓❑Yes ❑✓ Yes ❑Yes <br /> respond when the stored substance reaches <br /> the designated regulatory level? ❑No ❑ No ❑ No ❑ No <br /> 7. SUMMARY OF TEST RESULTS <br /> OPE Test Results ❑✓ Pass ❑✓ Pass ❑✓ Pass ❑ Pass <br /> ❑Fail ❑Fail ❑ Fail ❑ Fail <br /> 8. COMMENTS <br /> *❑Check this box if flow restrictors interfere with overfill prevention and repairs are required. <br /> All tests marked "Fail"and any repairs made during the test must be described in Section 8. <br /> Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s) Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.