My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2026 8:02:45 PM
Creation date
1/2/2026 4:59:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231211
PE
2371 - UST FACILITY - 1702 COMPLIANT
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
6425 N PACIFIC AVE STOCKTON 95207
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Underground Storage Tank <br /> Secondary Containment Testing Report Form <br /> 6. TANK SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ❑ Industry Standard ❑ Professional Engineer <br /> Test Type ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: NIA <br /> ❑ Check this box if Appendix 8.1 continuation page is attached. <br /> Tank ID <br /> Tank Manufacturer <br /> Test Start Time <br /> Initial Reading <br /> Test End Time <br /> Final Reading <br /> Change in Reading <br /> Pass/Fail Criteria <br /> Tightness Test Results ❑ Pass❑ Fail ❑Pass❑ Fail ❑Pass❑ Fail ❑ Pass❑ Fail <br /> 7. PIPE SECONDARY CONTAINMENT TEST <br /> Test Method Developed by ❑ Manufacturer ✓❑ Industry Standard [::] Professional Engineer <br /> Test Type ❑✓ Pressure ❑ Vacuum ❑ Hydrostatic <br /> Test Equipment Used: 0-10 Psi Gauges <br /> ❑ Check this box if Appendix 8.2 continuation page is attached. <br /> Pipe Run ID 87 East 87 West 91 East 91 West <br /> Pipe Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass Western Fiberglass <br /> Test Start Time 11:00 am 11:05 am 11:10 am 11:15 am <br /> Initial Reading 5 psi 5 psi 5 psi 5 psi <br /> Test End Time 12:00 pm 12:05 pm 12:10 pm 12:15 pm <br /> Final Reading 5 psi 5 psi 5 psi 5 psi <br /> Change in Reading 0 0 0 0 <br /> Pass/Fail Criteria 0 0 0 0 <br /> Tightness Test Results ❑✓ Pass❑ Fail ❑✓ Pass❑ Fail ❑✓ Pass❑Fail ❑✓ Pass❑ Fail <br /> Continuity Test Results ❑✓ Pass ❑Fail ❑✓ Pass❑Fail ❑✓ Pass ❑Fail ❑✓ Pass ❑Fail <br /> Pipe Run ID Diesel East Diesel West Vapor Return <br /> Pipe Manufacturer Western Fiberglass Western Fiberglass Western Fiberglass <br /> Test Start Time 11:20 am 11:25 am 11:30 am <br /> Initial Reading 5 psi 5 psi 5 psi <br /> Test End Time 12:20 pm 12:25 pm 12:30 pm <br /> Final Reading 5 psi 5 psi 0 psi <br /> Change in Reading 0 0 5 <br /> Pass/Fail Criteria 0 0 0 <br /> Tightness Test Results ❑✓ Pass ❑Fail ❑✓ Pass❑ Fail ❑Pass ❑✓ Fail ❑Pass❑Fail <br /> Continuity Test Results ❑✓ Pass ❑Fail ❑✓ Pass❑Fail ❑✓ Pass ❑Fail ❑Pass ❑Fail <br /> Describe in Section 9 all tests marked "Fail'and any repairs made during the test. Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.