Laserfiche WebLink
SAN aOAQUIN Environmental Health Department <br /> COUNTY— <br /> Greatness grows here. <br /> CP26 - UST FULL Inspection Report <br /> Facility Name: Facility Address: Date: <br /> RIVER POINT LANDING MARINA-RESORT* 14950 BUCKLEY COVE WAY STOCKTON JanuarV 16 2026 <br /> 12 23 CCR 16 2660(d) 2011017 -All test results have been submitted to UPA within 30 days of testing date <br /> OBSERVATION: Owner/Operator failed to submit the following test results to the UPA within 30 days of performing the <br /> test: <br /> - Monitoring System Certification Test <br /> -Spill Container Test <br /> - Line Tightness Test <br /> *All tests were done on January 1, 2025 and submitted to EHD on February 17, 2025- 12 days late. <br /> REGULATION GUIDANCE: 2660 (d) Underground storage tank owners or operators must submit completed test results <br /> to the Unified Program Agency within 30 days of performing the test. <br /> CORRECTIVE ACTION: Submit test results to UPA within 30 days and ensure all test results are submitted to UPA <br /> within 30 days of performing testing. <br /> This is a (Class 2)Violation. <br /> 16 23 CCR 16 2651(e) and (f), 2652; HSC 6.7 25290.1(d) and (e) 2031004 - Interstitial space of UST and piping are <br /> continuously monitored with audible/visual alarm (TCR 9d) <br /> OBSERVATION: Owner/Operator failed to Monitor piping with a continuous interstitial release detection system that <br /> activates an audible and visual alarm or stops the flow of hazardous substance at the dispenser when a release from the <br /> piping is detected <br /> - Both UDC sumps contain a float and chain assembly and both failed to stop the flow of hazardous substance at the <br /> dispenser <br /> REGULATION GUIDANCE: 2652 (a)(1)(B) Mechanical release detection equipment used to continuously monitor under- <br /> dispenser containment, including an impact shear valve, which fails to function properly at any time, cannot be repaired <br /> and must be replaced with continuous electronic release detection equipment to meet the requirements of this <br /> subdivision. <br /> CORRECTIVE ACTION: Float and Chain assembly must be replaced with continuous electronic release detection <br /> equipment under permit with EHD. <br /> This is a Repeat (Class 2)Violation. <br /> EHD-CUPA Inspection Report IS03 Page 5 of 7 FA0003811 PR0231028 4600848 1/16/2026 <br /> CP26-UaST FULL g <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />