Laserfiche WebLink
Appendix 7 <br /> Underground Storage Tank <br /> Overfill Prevention Equipment Testing Report Farm <br /> TESTING TYPE ❑ Installation Repair A 36 Month <br /> 1. FACILITY INFORMATION <br /> CERS ID Test Date <br /> 10411900 05/14/2026 <br /> Facility Name <br /> TESORO/SPEEDWAY 968221 <br /> Facility Address City ZIP Cade <br /> 2705 COUNTRY CLUB BLVD <br /> STOCKTON 95204 <br /> 2. SERVICE TECHNICIAN INFORMATION <br /> Company Performing Testing Phone <br /> Tanknology,Inc. 800-964-1250 <br /> Mailing Address <br /> 11000 N Mopac Expy#500 Austin,Tx 78759 <br /> Service Technician Performing Testing <br /> Jesus Saldivar <br /> Contractor License Number <br /> Class A General Engineering 743160 <br /> ICC Certification ICC Expiration Date <br /> 8361393 05/12/2027 <br /> 3. TRAINING AND CERTIFICATIONS <br /> Manufacturer and Test Equipment.Training Certifications Trainin Expiration Date <br /> Franklin Fueling:Phil-Tite EVR Ph 1 Systems(1004283708) 07/10/2026 <br /> 4. TEST PROCEDURE INFORMATION <br /> Test Procedures Used Components Tested _ <br /> INDUSTRYSTANDARDS DROP TUBES <br /> S. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST <br /> 1 hereby certify that the OPF was tested in accordance with California Code of Regulations, <br /> title 23, division 3, chapter 16, section 2665; that required supporting documentation, <br /> including calibration charts, is attached; and all information contained herein is accurate. 1 <br /> understand that test procedures must be made available upon request by the governing <br /> authority. <br /> Service Technician Signature Date Total # of Pages <br /> 05/14/2026 2 <br /> CERS = California Environmental Reporting System, [CC = International Code Council; <br /> ID = Identification; CPE = Overfill Prevention Equipment <br /> Page 1 of 2 <br />