My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
COUNTRY CLUB
>
2705
>
2300 - Underground Storage Tank Program
>
PR0231072
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2026 4:50:04 PM
Creation date
1/14/2026 9:10:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0231072
PE
2361 - UST FACILITY
FACILITY_ID
FA0002048
FACILITY_NAME
TESORO (SPEEDWAY) 68221
STREET_NUMBER
2705
STREET_NAME
COUNTRY CLUB
STREET_TYPE
BLVD
City
STOCKTON
Zip
95204
APN
12121008
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\bmascaro
Supplemental fields
Site Address
2705 COUNTRY CLUB BLVD STOCKTON 95204
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address:2705 Country Club, Stockton <br /> Piping Runs areEstimated <br /> en <br /> • st� a e • <br /> 208 10 ---—— <br /> t <br /> 3 2Q8 N.�.41 : 1uS0' <br /> 209 20$ . . . . . . . . <br /> l 7 $ . <br /> TLS <br /> STP . . . . . t . . . . . <br /> Z08. r '`�: 46 <br /> LD2000 <br /> '208 <br /> .�O � �: ASS... ,✓r'r. `t <br /> —— 20.8 . �"' . ( STS�.{P. <br /> :Q 2b8 aco <br /> RJ I16;056-5 .� •Z08LDZ000 <br /> Tate map was drawn:05/11/2022 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your <br /> Monitoring System Certification. On your site plan,show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces,sumps,dispenser pans,spill containers, or other secondary containment areas;mechanical or electronic line leak <br /> detectors;and in-tank liquid level probes(if used for leak detection). In the space provided,note the date this Site Plan <br /> was prepared. Page 1 of 1 05/00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.