Laserfiche WebLink
Underground Storage Tank <br /> ReIease Detection Equipment Testing Deport Form <br /> B. SENSOR TEST RESULTS <br /> ❑ Check this box if Appendix 5, 1 continuation page is attached. <br /> List only sensors tested. List 'Sensor ID"as labeled In system programming. For VPH monitoring, <br /> continuity must be confirmed between the most distant points to the interstitial space to the extent <br /> practicat as approved by the Unified Program Agency and the sensor that monitors the zone. <br /> Sensor Sensor Component(s) Monitored Function Continuity <br /> JD Model Pass Fail Pass Fail NA <br /> Li 208 Supreme STP Sump ❑ ❑ C3 <br /> L2 208 Unleaded STP Sump ❑ ❑ ❑ <br /> L3 208 Diesel- TP Sump ❑ R ❑ <br /> L4 40 supreme I Diesel Tank Annular ❑ _ ❑ d <br /> L5 420 Unleaded Annular ❑ Q ❑ <br /> L6 1.208 Dispensers 5-6 UDC 0 0 ❑ <br /> L7 208 Dispensers 7-8 UDC ❑ G] Q _ <br /> ❑ ❑ ❑ ❑ ❑ <br /> Q ❑ ❑ ❑ C) <br /> a ❑ o ❑ ❑ <br /> ❑ ❑ ❑ 0 ❑ <br /> ❑ Q ❑ fl ❑ <br /> ❑ a ❑ 0 <br /> a ❑ ❑ ❑ p <br /> a ❑ ❑ ❑ ❑ <br /> ❑ Q l� ❑ ❑ <br /> Q ❑ ❑ a ❑ <br /> ❑ a a a n <br /> ❑ ❑ ❑ a <br /> ❑ ❑ ❑ ❑ ❑ <br /> a Q ❑ ❑ ❑ <br /> 0 0 ❑ ❑ ❑ <br /> Describe ail answers marked OW or°Fail"and the proposed remedy in Section 8_ <br /> List all equipment either replaced or repaired (inciuding cleaning or adjustment) to Section 8_ <br /> Page 3 of 6 <br />