Laserfiche WebLink
Permit Unit Requirements for N-4070-1-11 (continued) Page 14 of 14 <br />These terms and conditions are part of the Facility-wide Permit to Operate. <br />Facility Name: FOOTHILL SANITARY LANDFILL <br />Location: 6484 N WAVERLY RD,LINDEN, CA 95236 <br />N-4070-1-11 : 9/24/2025 3:25:45 PM -- ROBINSOM <br />122. Permittee shall keep records of the equipment operating parameters specified to be monitored under section <br />95469(b)(1) as well as records for periods of operation during which the parameter boundaries established during the <br />most recent source test are exceeded. The records must include the following information: 1. For enclosed flares, all 3- <br />hour periods of operation during which the average temperature difference was more than 28 degrees Celsius (or 50 <br />degrees Fahrenheit) below the average combustion temperature during the most recent source test at which compliance <br />with sections 95464(b)(2) was determined and a gas flow rate device which must record the flow to the flare at least <br />every 15 minutes. [17 CCR 95470] Federally Enforceable Through Title V Permit <br />123. Permittee shall submit the following reports as required in section 95470(b): Closure notification, Equipment removal <br />report and Annual report. All reports must be accompanied by a certification of truth, accuracy, and completeness <br />signed by a responsible official. [17 CCR 95470] Federally Enforceable Through Title V Permit <br />124. Permittee shall submit the following reports as required in 17 CCR Section 95470(b): Equipment removal report, Heat <br />input capacity report, and Annual report. All reports must be accompanied by a certification of truth, accuracy, and <br />completeness signed by a responsible official. [17 CCR 95470 (b)] Federally Enforceable Through Title V Permit <br />125. Permittee may comply with the CARB regulation for landfill methane control measures by using approved alternative <br />compliance options. The permittee shall obtain written District approval for the use of any alternative compliance <br />options not approved by this permit. Changes to the approved alternate compliance options must be made and <br />approved in writing. Documentation of approved alternative compliance options shall be available for inspection upon <br />request. [17 CCR 95468] Federally Enforceable Through Title V Permit