My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_AMENDED JTD 1/5/2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_AMENDED JTD 1/5/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 9:19:04 AM
Creation date
1/16/2026 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
AMENDED JTD 1/5/2026
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project No. AU25.1274 | PCPCMP Foothill Sanitary Landfill 7 <br />September 2025 <br />The first phase of an LFG control system was installed in 2006, which included nine vertical LFG <br />wells and the flare station. This initial system has been expanded and currently consists of 39 <br />vertical extraction wells and 17 horizontal collectors. Additional horizontal collectors and vertical <br />wells will be added as the landfill is developed. The configuration and extent of the final landfill <br />gas system is shown on Figure 6. <br />It is assumed that all LFG system components are installed in projects prior to the closure project <br />and that no construction costs for the LFG system will be incurred during closure. Costs for <br />operation and maintenance of the LFG collection system in the post-closure maintenance period <br />are included in post-closure maintenance costs. <br />Landfill gas condensate generated by the LFG collection system will be handled as leachate in <br />accordance with the Waste Discharge Requirements. <br />2.5.4 LFG Treatment <br />Collected gas will be combusted as fuel for electrical generators or in one or more flare stations <br />in accordance with the applicable SJVAPCD permits and regulations. <br />LFG collected from the field is transported to the site’s landfill-gas-to-energy plant (operated by <br />Ameresco Inc.) to generate power. The flare station is maintained as a back-up in the event the <br />LFGTE plant becomes non-operational; in which case the LFG is burned in the flare in accordance <br />with the Permit to Operate issued by the SJVAPCD. <br />Presently, the LFG treatment equipment is located within the future landfill footprint. The <br />treatment facilities will be moved in coordination with increasing the size of the facility to process <br />increasing LFG. This movement is not part of closure construction, and is not included in the cost <br />of closure. <br />2.5.5 Leachate Control <br />Leachate from present and future modules will be collected in leachate collection and recovery <br />systems installed with the modules (JTD Figure 18), and returned to lined modules in accordance <br />with the Waste Discharge Requirements. As the landfill approaches closure, placement of the <br />final cover and the overall thickness and absorptive capacity of the waste mass will cause less <br />leachate to be generated. At this time, it is anticipated that leachate will be pumped from sumps <br />using automatic, level sensing pumps and discharged through flow meters to onsite temporary <br />storage or returned to lined landfill modules in accordance with the WDRs. <br />It is also anticipated that the absorption capacity of the relatively dry refuse placed at the FSL, <br />and the uptake of water in the production of landfill gas, will allow for the return of leachate over <br />the lined modules for many years after closure. Inadequacy of those mechanisms, if it occurs, <br />would be indicated by the inability of the leachate pumps to remove leachate from the leachate <br />sumps to maintain less than 1 foot of liquid head over the liner. Monitoring of the leachate pumps <br />and sumps will indicate that this condition is developing. If this occurs, leachate generated after
The URL can be used to link to this page
Your browser does not support the video tag.