My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_AMENDED JTD 1/5/2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_AMENDED JTD 1/5/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2026 9:19:04 AM
Creation date
1/16/2026 9:06:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
AMENDED JTD 1/5/2026
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Foothill Sanitary Landfill Page 48 of 52 San Joaquin County DPW - Solid Waste <br />Joint Technical Document Revised 01/05/2026 <br /> <br /> <br />Landfill staff periodically inspects the cover on filled modules for low spots that could <br />allow for ponding water and make repairs as necessary. LF-1 does not have a leachate <br />collection and recovery system. Module 1 and all future modules will include a leachate <br />collection and recovery systems (LCRSs). <br /> <br />Leachate in Module 1 drains by gravity to the sump located in the southeast corner of <br />the module, from which it is pumped either to the 10,000-gallon storage tank or returned to the <br />refuse over an approved liner in accordance with the WDRs. Leachate generated from Module 1 <br />flows to a leachate sump from which it is pumped either to a storage tank or to infusion points <br />installed in the refuse filled areas in accordance with the WDRs. <br /> <br />Leachate from the storage tanks of future modules is ultimately returned back to the <br />waste in the same lined module in accordance with the regulations. <br /> <br />The public is not allowed to enter or be near any of the leachate control facilities of the <br />site. Site personnel monitor any breaches in security. Infusion points are designed and <br />installed away for active phase areas. Application of leachate directly to the refuse is away from <br />public access areas.
The URL can be used to link to this page
Your browser does not support the video tag.