|
Observation p E C Total Flow Flow Rate
<br />MO T ate (ȝmhos/cm)(gallons) (gal/day)
<br />Janurary 01/03/25 7.30 4,730 465,640 18,625.6
<br />February 02/04/25 8.20 4,990 79,050 2,470.3
<br />March 03/05/25 7.70 4,610 109,450 3,774.1
<br />April 04/04/25 6.90 5,440 94,530 3,151.0
<br />May 05/01/25 6.60 7,050 68,940 2,553.3
<br />June 06/02/25 7.80 7,910 58,260 1,820.6
<br />rea 2
<br />Observation p E C Total Flow Flow Rate
<br />MO T ate (ȝmhos/cm)(gallons) (gal/day)
<br />Janurary 01/03/25 7.60 4,790 99,080 3,963.2
<br />February 02/04/25 7.30 4,870 11,310 353.4
<br />March 03/05/25 7.60 4,410 26,210 903.8
<br />April 04/04/25 7.10 5,470 18,340 611.3
<br />May 05/01/25 7.30 6,680 13,530 501.1
<br />June 06/02/25 6.90 7,190 23,080 721.3
<br />rea 2B
<br />Observation p E C Total Flow Flow Rate
<br />MO T ate (ȝmhos/cm)(gallons) (gal/day)
<br />Janurary 01/03/25 7.30 6,390 370,900 14,836.0
<br />February 02/04/25 7.50 6,480 46,400 1,450.0
<br />March 03/05/25 7.30 5,790 47,000 1,620.7
<br />April 04/04/25 7.20 8,060 39,200 1,306.7
<br />May 05/01/25 6.80 8,740 42,900 1,588.9
<br />June 06/02/25 7.20 9,280 46,300 1,446.9
<br />Leachate level monitored to ensure leachate level within regulatory limits (Appendix G).
<br />E.C. = Electrical Conductivity
<br />μmho/cm = micromhos per centimeter
<br />gal/day = gallons per day
<br />Table 5
<br />First Semiannual 2025 Leachate Field Measurements
<br />Foothill Sanitary Landfill
<br />rea
<br />RI
|