My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
4400 - Solid Waste Program
>
PR0440004
>
COMPLIANCE INFO_AMMENDED JTD 1/5/2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2026 9:19:15 AM
Creation date
1/21/2026 8:58:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
AMMENDED JTD 1/5/2026
RECORD_ID
PR0440004
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004517
FACILITY_NAME
FOOTHILL LANDFILL
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09344002
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\cfield
Supplemental fields
Site Address
6484 N WAVERLY RD LINDEN 95236
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
745
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Item Description Units Unit Price Quantity Total Cost1E-1Final Closure Engineering and DesignComponents: Preparation of Final Closure Plans and Specifications, Final CQA Plan, Engineering, Management and Bid Documents Preparation Project Manager/Senior Engineer hr. 224.00$ 200 44,800$ Design Engineer hr. 184.00$ 600110,400$ AutoCAD hr. 90.00$ 400 36,000$ Expenses ls 12,000$ 1 12,000$ Subtotal, Final Closure Engineering and Design 203,200$ 1E-2Final CQA Monitoring and ReportingComponents: Monitoring, Inspection, Onsite and Offsite Laboratory Testing, Report, CertificationCertifying Engineer/Principal Engineer hr. 270.00$ 192 51,840$ Project Manager/ Senior Engineer hr. 224.00$ 768172,032$ CQA Monitor ( 4 required) hr. 132.00$ 6656 878,592$ AutoCAD hr. 153.00$ 120 18,360$ Travel and Per Diem (includes room, board, and vehicle) days 300$ 960288,000$ Offsite/Field Laboratory and Misc. Expenses months 6,500$ 8 52,000$ Subtotal Final CQA Monitoring and Reporting 1,460,824$ 1E-3Post Construction Aerial & Ground SurveyComponents: Target setting, aerial photogrammetry survey, and ground survey. Aerial Mapping ls 13,000$ 1 13,000$ Subtotal, Post Construction Aerial Surveying 13,000$ Subtotal, Final Cover 28,462,837$ FINAL COVER (Cont.)FOOTHILL SANITARY LANDFILLFoothill Sanitary Landfill Prelim Closure-Postclosure Cost Estimate August_2025_Final.xlsxPage 3 of 15
The URL can be used to link to this page
Your browser does not support the video tag.