Laserfiche WebLink
Fourth Quarter 2025 <br /> Table 1. Instantaneous Surface and Component Emissions Monitoring Results <br /> Foothill Landfill, Linden, California <br /> Instantaneous Data Report for November 3, 4, 14, 24 and December 4, 2025 <br /> Initial First 10-Day Second 10-Day 30-Day <br /> Monitoring Recheck Recheck Recheck <br /> Location (ppmv) Monitoring Monitoring Monitoring 120-Day <br /> (ppmv) (ppmv) (ppmv) Latitude Longitude <br /> Expansion Due: <br /> November 4, November 14, November 24, December 4, <br /> 2025 2025 2025 2025 <br /> RISER2 30,000 2,563 2,019 9,267 3/4/2026 38.0310710 -120.9302040 <br /> OPEN PIPE 3,667 8,186 12,300 8,134 3/4/2026 38.0317380 -120.9339020 <br /> G133 AG <br /> LCRS9 553 1,238 229 7,468 3/4/2026 38.0293910 -120.9303090 <br /> HC13 1,885 354 N/A 4,661 N/A 38.0289870 -120.9312030 <br /> LCRS7 10,000 3,539 7,466 4,517 3/4/2026 38.0306360 -120.9302130 <br /> LCRS6 10,000 1,341 1,341 3,733 3/4/2026 38.0308470 -120.9302070 <br /> LCRS2 4,080 7,487 8,133 3,682 3/4/2026 38.0318550 -120.9301660 <br /> RISER 1,378 1,996 23,300 3,185 3/4/2026 38.0310440 -120.9301800 <br />