Laserfiche WebLink
Fourth Quarter 2025 <br /> Table 2. Integrated Surface Emission Monitoring Results <br /> Foothill Landfill, Linden, California <br /> FID Concentration <br /> Point Name Record Date Comments <br /> (ppm) <br /> 1 11/4/2025 1.11 <br /> 2 11/4/2025 1.32 <br /> 3 11/4/2025 1.12 <br /> 4 11/4/2025 1.16 <br /> 5 11/4/2025 3.96 <br /> 6 11/4/2025 13.72 <br /> 7 11/4/2025 24.32 <br /> 8 11/4/2025 26.39 Initial Monitoring <br /> 8 11/14/2025 11.12 First 10-Day Recheck <br /> 9 11/4/2025 26.05 <br /> 9 11/14/2025 17.97 <br /> 10 11/4/2025 12.12 <br /> 11 11/4/2025 41.95 Initial Monitoring <br /> 11 11/14/2025 13.79 First 10-Day Recheck <br /> 12 11/4/2025 15.88 <br /> 13 11/4/2025 15.58 <br /> 14 -- -- Active Grid Area <br /> 15 -- -- Active Grid Area <br /> 16 11/4/2025 7.00 <br /> 17 11/4/2025 7.00 <br /> 18 11/4/2025 7.37 <br /> 19 11/4/2025 3.80 <br /> 20 11/4/2025 4.61 <br /> 21 11/4/2025 7.32 <br /> 22 11/4/2025 5.42 <br /> 23 11/4/2025 8.14 <br /> 24 11/4/2025 3.68 <br /> 25 11/4/2025 2.48 <br /> 26 11/4/2025 2.42 <br /> 27 11/4/2025 2.40 <br /> 28 11/4/2025 2.41 <br /> 29 11/3/2025 2.20 <br /> 30 11/3/2025 2.23 <br /> 31 11/3/2025 2.75 <br /> 32 11/3/2025 3.16 <br /> 33 11/3/2025 3.28 <br /> 34 11/3/2025 0.94 <br /> 35 11/3/2025 0.70 <br /> 36 11/3/2025 1.45 <br /> 37 11/3/2025 3.13 <br /> 38 11/3/2025 1.76 <br /> SCS ■ 1of5 <br />